Site work for a water / sewer project in Chanute, Kansas. Completed plans call for site work for a water / sewer project.

As of October 18,2019 This project has not yet been awarded. A timeline for award has not yet been established. The Project is generally described as follows: Phase 4 - Sanitary Sewer Collection System Improvements (Basins 1 & 5-10): Work includes furnishing all the labor, materials, and equipment for the construction staking; mobilization; erosion control; and grass seeding. The Sanitary Sewer Collection System Improvements can further be divided into Phase 4 -Wastewater Manhole Improvements and Phase 4 - Wastewater Gravity Sewer Line Improvements as describe below: Phase 4 - Wastewater Manhole Improvements (Basins 5-10): Work includes furnishing all the labor, materials, and equipment for the wastewater manhole improvements. The improvements include, 16 manhole frame and cover replacements, 25 manhole seal frame seals, 41 manhole frame seal replacements, 1 manhole realignment, 12 manhole seal precast joints, 42 manhole bench/invert rehabs, 22 manhole pipe seal rehabs, 72 manhole step removals, 15 manhole grade adjustments, installation of 7 manhole inserts, convert 1 flush tank to manhole, 812 vertical feet of manhole lining, and all other incidental and appurtenant work required to complete the manhole improvements as shown and specified. Any temporary bypass pumping of wastewater during construction is also included. Phase 4 - Wastewater Gravity Sewer Line Improvements (Basins 1 & 5-10): Work includes furnishing all the labor, materials, and equipment for the wastewater gravity sewer line improvements. The improvements include 7 point repairs, 121 lateral repairs, 8,096 linear feet of 8" cured-in-place pipe, removal and replacement of surfacing, and all other incidental and appurtenant work required to complete the improvements as shown and specified. Any temporary bypass pumping of wastewater during construction is also included. Bidding Documents also may be examined at: Wilson & Company, Inc., Engineers & Architects, 1700 East Iron Avenue, Salina, KS 67401 City of Chanute, 101 S. Lincoln, Chanute, KS 66720 Bid Bond/Security will be required in accordance with the Instructions to Bidders. Bidder qualifications may be required in accordance with Instructions to Bidders. Contract time will be set in accordance with the Instructions to Bidders and Agreement. OWNER reserves the right to reject any or all Bids and to waive irregularities in bidding. Bidder's attention is called to the required compliance with the Kansas Department of Health and Environment, Kansas Water Pollution Control Revolving Loan Fund (KWPCRLF) Requirements. Nondiscrimination in Employment: Bidders on this work, Bidders on this work will be required to comply with the presidents Executive Order No. 11246 as amended. Requirements for bidders and contractors under this order are explained in the specifications. Attention of bidders is called to the requirements as to conditions of employment to be observed and Federal prevailing wage rates to be paid under the contract, Section 3 of the 1968 Housing Act, Segregated Facility, Section 109 of the 1974 Housing and Community Development Act, and the Civil Rights Act of 1964. Any questions regarding the Bidding Documents should be directed to ENGINEER. ENGINEER: WILSON & COMPANY, INC., ENGINEERS & ARCHITECTS Attn: Brian Spano, P.E., Project Manager Email: brian.spano@wilsonco.com Telephone: (785) 820-2603

Bid Results

Water / Sewer

$760,358.00

Public - City

Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
14
Bidding Soon
215
All Active Projects
87
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2019

November 6, 2019

img_map_placeholder

To Be Determined, Chanute, KS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.