BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; and for paving for a road / highway.

SECTION I (Project ID No. C01216) Construction of a bituminous pavement overlay, including milling of the existing bituminous pavement on the eastbound and westbound lanes of Provincial Trunk Highway 101, from Provincial Trunk Highway 6 to Provincial Trunk Highway 7, for a total construction distance of approximately 5.9km in the Municipalities of Rosser, West St. Paul, East St. Paul, and City of Winnipeg, SECTION II (Project ID No. C01215) Construction of a bituminous pavement overlay, including milling of the existing bituminous pavement on the eastbound lanes of Provincial Trunk Highway 101, from Provincial Trunk Highway 7 interchange to Provincial Road 204, for a total construction distance of approximately 12.6km in the Municipalities of Rosser, West St. Paul, and East St. Paul, SECTION III (Project ID No. C01214) Construction of a bituminous pavement overlay, including milling of the existing bituminous pavement on the eastbound and westbound lanes of Provincial Trunk Highway 101, Provincial Road 204 to Provincial Trunk Highway 59, for a total construction distance of approximately 1.5km in the Municipality of East St. Paul, SECTION IV (Project ID No. C21038) Construction of bituminous pavement overlay of the existing bituminous pavement on the eastbound and westbound lanes of Provincial Trunk Highway 101, 0.1 km north of PTH 15 at the CN Redditt Mile 243.67 Rail Crossing for a total construction distance of approximately 0.1km in the Municipality of Springfield, SECTION V (Project ID No. C01272) Construction of a bituminous pavement overlay, including milling of the existing bituminous pavement on the eastbound and westbound lanes of Provincial Trunk Highway 101, 3.6km south of PTH 15 at the G.W.W.D. Aqueduct Rail Crossing mileage 12.1 for a total construction distance of approximately 0.04km in the Municipality of Springfield,

Award

Roads / Highways

$1,161,050.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
6
Bidding Soon
219
All Active Projects
59
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2019

October 21, 2019

img_map_placeholder

Multiple Locations, Winnipeg, MB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.