Renovation of a water / sewer project in Bethlehem, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

General Construction - $1 million - $1.5 million Ventilation Construction - $295,000 - $450,000 Electrical Construction - $100,00 - $150,000 This solicitation contains ALL Project Documents, Addenda, and Questions and Answers for the WWTP Bar Screen and Detritor Replacement Project as well as the Bid Form for 2019-11 General Constructoin. The Bid Forms for 2019-11 Ventilation, Bar Screen and Detritor Replacement, and 2019-11 Electrical, WWTP Bar Screen and Detritor Replacement are available on their respective solicitations. Please submit all inquiries and questions via the Questions tab. Do not call or e-mail the engineer or owner. The City of Bethlehem encourages women and minority businesses to bid on City jobs. 2019-11 General 2019-11 Ventilation 2019-11 Electrical Questions must be submitted on or before 10/08/2019 12:00 PM Bid Result General Construction LB Industries Inc-$1,298,456 Ventilation Tri-County Mechanical, Inc-$384,000 Electrical Construction BSI-$248,525

Award

Water / Sewer

$632,525.00

Public - City

Renovation

Subscribe For Documents

98 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Rehabilitation of Cast-in-Place Concrete, Rehabilitation of Precast Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Bituminous Dampproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Plastic Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Lifts, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Hangers and Supports for Fire-Suppression Piping and Equipment, Fire Suppression Systems Insulation
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Gas and Vapor Process Piping, Liquids Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Piece Material Handling Equipment, Conveyors, Piece Material Conveyors, Lifting Devices, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
215
Bidding Soon
3,691
All Active Projects
1,714
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2019

December 17, 2019

img_map_placeholder

144 Shimersville Rd, Bethlehem, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Treatment Plant Bar Screen and Detritor Replacement - General, Ventilation, Electrical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.