Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 8, 2024 at 7:00 PM
Updated January 27, 2024
Site work, paving and new construction of a mixed-use development in Oroville, California. Design plans call for the construction of a municipal facility; parking garage; for site work for a municipal facility; parking garage; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Per the owner, as of January 8, 2024, an award has been made for this solicitation. The owner states that the project is finalizing schematic design. The owner states that the project is anticipated to bid in the fall of 2024 and a firm timeline for construction is not known at this time. Closed solicitation has been included below for reference. ............ The County anticipates that the A&E Firm selected for this work shall conduct meetings and research existing conditions to determine the best use of the property and the best layout for the facility. After determining the Probation Department needs, Contractor shall develop schematic drawings and details as a basis for future design documents. The Contractor shall approach the project with the current adopted California Code Cycle (C.C.R. Title 24) as a basis for building requirement and energy efficiency. The facility will include offices and meeting rooms with a secure lobby with medium level security features. A lower level parking garage with two 2) stories above is assumed based on the current understanding of the department's needs. However, the County will give due consideration to alternative approaches and design solutions proposed by the successful A&E Firm. Final Date to Summit Questions and Requests for Clarification Friday April 15, 2022 by 3:00 PM Questions Answered via Addendum(s) Tuesday, April 26, 2022 by 5:00 PM Preliminary Evaluation Completed Tuesday, May 31, 2022 Presentation/Demonstration (if desired) Thursday, June 9, 2022 Evaluation Completion Friday, June 17, 2022 The method of Contractor Selection has not been Determined at this time.
Design
Municipal
$4,000,000.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2024
Gillick Wy & County Center Dr, Oroville, CA
Related To This Project
Oroville, CA
Bid Date: Mar 17 2022
Oroville, CA
Bid Date: May 05 2022
Oroville, CA
Bid Date: May 11 2022
Oroville, CA
Bid Date: Apr 21 2022
Oroville, CA
Bid Date: May 05 2022
Oroville, CA
Bid Date: Apr 07 2022
Oroville, CA
Bid Date: May 19 2022
Oroville, CA
Bid Date: Jun 09 2022
Oroville, CA
Bid Date: Oct 22 2020
Oroville, CA
--
Oroville, CA
Bid Date: Apr 07 2022
Oroville, CA
Bid Date: Oct 12 2020
Oroville, CA
Bid Date: Jan 26 2021
Oroville, CA
Bid Date: May 25 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
