BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2019 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Huxley, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Base Bid - Water Main Replacement by Open Cut and Street Mill and Overlay Installation of 8" water main by open cut, existing water main cap and abandonment, water service replacement, sanitary and storm sewer minor manhole adjustments ,storm sewer minor intake, pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, seeding and fertilizing, sidewalk replacement, traffic control and all other miscellaneous work required to complete section. The base bid is located at N. 1st Ave. from E. 3rd Street to E. 4th Street. Alternate #1 - Water Main Replacement by Directional Drill and Street Mill and Overlay Installation of 8" water main by direction drill, existing water main cap and abandonment, water service replacement, sanitary and storm sewer minor manhole adjustments ,storm sewer minor intake, pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, curb and gutter replacement, sidewalk replacement, traffic control, seeding and fertilizing, and all other miscellaneous work required to complete section. The Alternate #1 bid is located at N. 1st Ave. from E. 3rd Street to E. 4th Street. Alternate #2 - Street Mill and Overlay Pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, curb and gutter replacement, seeding and fertilizing, sidewalk replacement, traffic control and all other miscellaneous work required to complete section. The Alternate #2 bid is located at N. Central Ave. from E. 3rd Street to E. 4th Street. Alternate #3 - Street Mill and Overlay Pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, curb and gutter replacement, seeding and fertilizing, sidewalk replacement, traffic control and all other miscellaneous work required to complete section. The Alternate #3 bid is located at Lynwood Dr. from N 5th Ave. to N. Main Ave. Alternate #4 - Street Mill and Overlay Pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, curb and gutter replacement, seeding and fertilizing, sidewalk replacement, traffic control and all other miscellaneous work required to complete section. The Alternate #4 bid is located at Lynwood Dr. from Maple Dr. from Timberlane Dr. to Oak Blvd. Estimated Value: Base Bid: $168K, Alternate #1: 145K, Alt

Award

Water / Sewer

$158,109.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
98
Bidding Soon
1,146
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2019

November 4, 2019

Project location map

Multiple Locations, Huxley, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.