Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 11, 2019 at 7:00 PM
Updated January 26, 2024
Site work and paving for a mixed-use development in Huxley, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Base Bid - Water Main Replacement by Open Cut and Street Mill and Overlay Installation of 8" water main by open cut, existing water main cap and abandonment, water service replacement, sanitary and storm sewer minor manhole adjustments ,storm sewer minor intake, pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, seeding and fertilizing, sidewalk replacement, traffic control and all other miscellaneous work required to complete section. The base bid is located at N. 1st Ave. from E. 3rd Street to E. 4th Street. Alternate #1 - Water Main Replacement by Directional Drill and Street Mill and Overlay Installation of 8" water main by direction drill, existing water main cap and abandonment, water service replacement, sanitary and storm sewer minor manhole adjustments ,storm sewer minor intake, pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, curb and gutter replacement, sidewalk replacement, traffic control, seeding and fertilizing, and all other miscellaneous work required to complete section. The Alternate #1 bid is located at N. 1st Ave. from E. 3rd Street to E. 4th Street. Alternate #2 - Street Mill and Overlay Pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, curb and gutter replacement, seeding and fertilizing, sidewalk replacement, traffic control and all other miscellaneous work required to complete section. The Alternate #2 bid is located at N. Central Ave. from E. 3rd Street to E. 4th Street. Alternate #3 - Street Mill and Overlay Pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, curb and gutter replacement, seeding and fertilizing, sidewalk replacement, traffic control and all other miscellaneous work required to complete section. The Alternate #3 bid is located at Lynwood Dr. from N 5th Ave. to N. Main Ave. Alternate #4 - Street Mill and Overlay Pavement patching, 2" HMA pavement milling, 2" HMA pavement overlay, curb and gutter replacement, seeding and fertilizing, sidewalk replacement, traffic control and all other miscellaneous work required to complete section. The Alternate #4 bid is located at Lynwood Dr. from Maple Dr. from Timberlane Dr. to Oak Blvd. Estimated Value: Base Bid: $168K, Alternate #1: 145K, Alt
Award
Water / Sewer
$158,109.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2019
November 4, 2019
Multiple Locations, Huxley, IA
Related To This Project
Huxley, IA
--
Huxley, IA
Bid Date: Mar 07 2024
Huxley, IA
Bid Date: May 07 2024
Huxley, IA
Bid Date: Aug 15 2024
Huxley, IA
--
Huxley, IA
Bid Date: Dec 04 2024
Huxley, IA
Bid Date: Jan 23 2025
Huxley, IA
Bid Date: Jun 28 2021
Huxley, IA
Bid Date: Oct 07 2021
Huxley, IA
Bid Date: Sep 17 2020
Huxley, IA
Bid Date: Mar 16 2021
Huxley, IA
Bid Date: Jan 10 2023
Huxley, IA
--
Huxley, IA
Bid Date: Apr 02 2019
West Des Moines, IA
Bid Date: Mar 11 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
