Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Akron, Ohio. Completed plans call for site work for a water / sewer project.
This project consists of sewer repairs throughout the City of Akron, many to be installed with trenchless technology. Many locations include repairs on only one sewer segment, from manhole to manhole, rather than an entire street. Generally, work will be completed at each site within 1-2 weeks. Road closures and detours may be necessary but will be avoided as much as possible. City of Akron Local Goal: 18% EDGE/DBE /MBE/WBE/SBE/VBE (minimum 3% WBE) EPA Goals: 1.3% MBE and 1.0% WBE City of Akron Local Hiring Requirement: 50% local resident participation The Unified Certification Program (UCP) administered by the Ohio Department of Transportation (ODOT) can provide necessary DBE certifications. This procurement is subject to the Environmental Protection Agency (EPA) policy of encouraging the participation of small businesses in rural areas (SBRAs). For the purpose of this Project, the Minority Business Enterprise (MBE) Utilization goals shall be defined as contractors and/or subcontractors with MBE's for the minimum amount of 1.3% of the Contract Price; and the Women's Business Enterprise (WBE) Utilization goals shall be defined as contractors and/or subcontractors with WBE's for the minimum amount of 1.0% of the Contract Price. Each Proposal must include a detailed plan to meet or exceed the City's local workforce goals, and a separate plan to meet or exceed the City's local EDGE/DBE/MBE/SBE/VBE WBE firm goals and the EPA diversity inclusion goals set forth above. The final agreed upon plans will be attached to the Agreement as exhibits and the selected Proposer shall be obligated to comply with said plans. The City of Akron is committed to ensuring that individuals with disabilities are able to fully participate in public programs, services, and activities. Anyone who is in need of an accommodation from any City department is invited to contact Donald Rice, Director of Human Resources, 166 South High Street, Municipal Building, Suite 103, Akron, Ohio 44308, (voice) 330-375-2780 as soon as possible. If you require TDD phone service call Ohio Relay at 800-750-0750 and they will assist in contacting the Department of Human Resources at (330) 375-2780. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of their project. Domestic steel use requirements as specified in Section 153.011 of the Ohio Revised Code apply to this Project. Copies of Section 153.011 of the Ohio Revised Code can be obtained from the Ohio Department of Administrative Services. Except as provided in Section 102.07 of the City of Akron, Construction and Materials Specifications, 2008 Edition, each proposal must be accompanied by a certified check in the sum of 5% of bids on a solvent bank, or a bid bond in like amount, acceptable to the City of Akron, as a guarantee, that if the proposal is accepted, a contract will be entered into. Proposals may be held by City for a period not to exceed one hundred twenty (120) days after the date Proposals are opened for the purpose of reviewing the Proposals and investigating the qualifications of Proposers prior to awarding the Agreement. Except as provided in Section 34.09 of the City's Code of Ordinance, the Proposer to whom the Agreement is awarded will be required to furnish a performance and payment bond in the sum of 100% of the Contract Price for the faithful performance of the contract. The performance and payment bond shall remain in full effect until Final Completion of the Project. The Director of Public Service reserves the right to reject any or all bids, and to waive informalities.
Bid Results
Water / Sewer
$1,598,605.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2019
December 17, 2019
Multiple Locations, Akron, OH
Related To This Project
Akron, OH
Bid Date: Apr 26 2019
Akron, OH
Bid Date: Feb 08 2024
Akron, OH
Bid Date: Aug 10 2023
Akron, OH
Bid Date: Aug 23 2023
Akron, OH
Bid Date: Jul 28 2023
Akron, OH
Bid Date: Feb 08 2022
Akron, OH
Bid Date: Aug 23 2023
Akron, OH
Bid Date: Aug 25 2023
Akron, OH
Bid Date: Feb 19 2020
Akron, OH
Bid Date: Oct 13 2020
Akron, OH
Bid Date: Oct 04 2023
Akron, OH
Bid Date: Aug 04 2023
Akron, OH
Bid Date: Oct 25 2023
Akron, OH
Bid Date: Aug 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.