Published September 22, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Hermiston, Oregon. Completed plans call for site work for a water / sewer project.

The purpose of the ITB is to establish a Contract for RTC Date Street Utilities Extension for the benefit of Oregon Military Department (OMD). The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the ITB and the Contract Documents. Upgrade or replacement of existing potable water system, sewer water system, and storm water systems The following range is a project estimate for bonding purposes only: $725,000 to $760,000 Project Start Date: 30 Calendar Days From Issuance of Notice to Proceed. Substantial Completion: 200 Calendar Days From Issuance of Notice to Proceed Final Completion: 230 Calendar Days From Issuance of Notice to Proceed The single Point of Contact POC for all questions regarding the ITB, forms, Specifications, Plans, bidding process, changes, clarifications, requests for brand approval, substitution requests, the award process, protests and any other issues that may arise is Name: Sam Goff - CPPB Phone: 971-355-4167 E-mail: samuel.a.goff.nfg@army.mil Liquidated damages will not apply to the contract resulting from this ITB. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$739,000.00

Public - Federal

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Weigh Scales
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
9
Bidding Soon
136
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2022

October 20, 2022

img_map_placeholder

78798 Ordnance Rd, Hermiston, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.