BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 14, 2020 at 8:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in Bridgewater, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of September 14, 2020, the awarded amount is $802,572.79. The intent of the BWT-6 Roadway Improvement Project is to address all pavement failures, resurface the road, and add/replace parts of the drainage system to address any drainage issues directly impacting the road surface and adjoining shoulder. The work includes Tullo Road (Washington Valley Road to Mallard Drive) and South Knob (Entire Length). 1. Job Description: The work included under this Contract generally includes improvements to Tullo Road and South Knob, as described in these specifications and as shown on plans entitled BWT-6 Roadway Improvement Project, dated June 12, 2020, prepared by Keller & Kirkpatrick, Inc. 2. Completion: The CONTRACTOR shall perform the necessary work required for each element of the project and in so doing shall protect and support existing structures and repair them if damaged and do all else necessary and as specified in the Contract Documents and as shown on the plans to complete the work in a manner satisfactory to the municipality.

Award

Roads / Highways

$802,573.00

Public - City

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
919
Active Projects
338
Bidding Soon
7,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2020

August 17, 2020

Project location map

Multiple Locations, Bridgewater, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.