Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in San Diego, California. Design plans call for the construction of a transportation facility; and for site work for a transportation facility.
The San Diego Association of Governments (SANDAG) released a report detailing plans to improve transit to and from the San Diego International Airport. Four separate options are outlined and range in cost from $1.8 billion to $4.7 billion. Officials are in favor of the most expensive option: building a multi-level Grand Central Station and an underground people mover connecting to the airport. Cost estimates range from $3.9 billion to $4.7 billion to develop the concept. The station would sit on Navy property north of the airport. The underground people mover would run 80 feet below ground and take travelers directly to the airport via a one-mile tunnel. The other options under consideration include an elevated people mover from the Navy property, an elevated people mover from the proposed transit hub near the Rental Car Center, and an extension of the existing trolley system. Officials will also explore potential funding sources, including federal grants. As of June 7, 2022, the project is being proposed. The project is in the community input phase. A draft environmental impact statement assessing all five alternatives on the NAVWAR OTC redevelopment proposal is out for public review. A timeline for design and construction has not been determined. The Navy will formally start its environmental analysis. Officials will also explore potential funding sources, including federal grants. ALTERNATIVE 1 o Navy-only redevelopment of NAVWAR facilities would occur by phasing construction projects over five years. This alternative would not involve mixed-use development or a transit center on OTC. o NAVWAR operations would be consolidated into two of the existing 310,000-square-foot buildings on OTC Site 1. No additional demolition or construction would occur on OTC Site 2. o On-site utilities would be repaired or upgraded. o Security and anti-terrorism force protection upgrades would occur, including entry control point and circulation improvements. ALTERNATIVE 4 o10,000 residential units. o 2,058,750 square feet of commercial space. o Two hotels with 450 total rooms. o 433,750 square feet of retail space. o 109 buildings: two low-rise, 19 low to mid-rise, 51 mid-rise, 35 high-rise, two standalone parking structures. o Tallest buildings up to 350 feet, approximately 32 floors. o On-site transit facility at OTC Site 1.
Design
Transportation Terminals
$4,000,000,000.00
Public - County
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2022
To Be Determined, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Jun 08 2022
San Diego, CA
Bid Date: Apr 28 2022
San Diego, CA
Bid Date: Apr 20 2022
San Diego, CA
Bid Date: Apr 27 2022
San Diego, CA
Bid Date: Apr 26 2022
San Diego, CA
Bid Date: Apr 26 2022
San Diego, CA
Bid Date: Apr 28 2022
San Diego, CA
Bid Date: Apr 18 2022
San Diego, CA
Bid Date: May 06 2022
San Diego, CA
Bid Date: Jun 01 2022
San Diego, CA
Bid Date: Mar 11 2021
San Diego, CA
Bid Date: May 20 2022
San Diego, CA
Bid Date: Apr 12 2022
San Diego, CA
Bid Date: Oct 15 2019
San Diego, CA
Bid Date: Sep 08 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.