Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Austin, Texas. Completed plans call for the construction of a 67,207-square-foot laboratory facility; 169,249-square-foot warehouse / distribution facility; and 434,574-square-foot municipal facility.
Bid Package 3 - Material testing, Lifting/hoisting, Site MEPF underground, Under-slab utilities (office/CUP/garage), Slab-on-grade and structural foundations (office/CUP/garage), Street traffic signals at Burleson Rd/Stassney Ln, Elevators (office/garage) Bid Package 4 - Material testing, Drilled piers (warehouse/lab), Under-slab utilities (warehouse/lab), Slab-on-grade and structural foundations (warehouse/lab) Bid Package 5 - OFFICE/CUP/GARAGE - Material testing, Concrete structure, Envelope/skin, MEPF, controls, and low voltage, Interior build out Bid Package 6 - WAREHOUSE/LAB - Material testing, Tilt-up concrete wall and structural steel structure, Envelope/skin, MEPF, controls, and low voltage, Interior build out Bid Package 7 The owner has selected a Construction Manager. Construction is expected to start in November 2019. TxDOT has initiated a campus consolidation project that will consolidate multiple division offices at a single campus to improve efficiency, communication, and collaboration between the various divisions. The site selected for the new campus is a 48.97 acre tract located in southeast Austin adjacent to Burleson Road on the North, and East Stassney Lane to the East. The site is heavily wooded with cedars and mesquite scrub trees, and has a swale running northwest to southeast through the site. Primary access to the site is anticipated to be from East Stassney Lane with a potential secondary access from Burleson Road. State desires that the campus utilize the natural site features to organize the design of the campus. The necessity to begin vacating the Riverside administration facilities in mid-2022 is the primary driver to complete construction of the campus by Dec 2021, with a 6 month phased move in. Currently, the functional program and campus masterplan have been completed and the Schematic Design phase is in progress. Upon Legislative approval of funding, it is TxDOT's intent to issue an RFQ in late 2018 for a Construction Manager at Risk (CMAR) enter into an initial contract for the CMAR's services in Spring of 2019. The 2019 State Legislative is expected to approve the project funding so that construction can commence in September/October 2019. Approval of $326 million will be requested during the 2019 Legislative session. Depending on the outcome, the budget and scope will be reviewed and adjusted to meet the approved funding Questions: Email us at TxDOTCampus@txdot.gov The Texas Department of Transportation's HUB goal for Building Construction Services is 21.1%. The State of Texas has initiated a campus consolidation project (''the Project'') that will consolidate the following TxDOT division offices at a single campus to improve efficiency, communication, and collaboration between the various divisions. Riverside Campus, 118, 150, 200 East Riverside Drive, Austin, TX 78704. Camp Hubbard Campus, 3500 - 4000 Jackson Avenue, Austin, TX 78731. Cedar Park Campus, 9500 N Lake Creek Parkway, Austin, Texas 78717. Centimeter Warehouse, 2000 Centimeter Circle, Austin, Texas 78758. Braker Warehouse, 2400 Braker Lane, Austin, Texas 78758. Additionally, a project Information Session will be held 11:30AM on October 10, 2019 at the Gus Garcia Recreation Center located at 1201 E. Rundberg Lane, Austin, TX 78753. If you have any questions, please contact Chris Ramon at: (281) 808-5091 or email at: cramon@vaughnconstruction.com.
Post-Bid
Municipal
$326,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2019
December 7, 2020
Multiple Locations, Austin, TX
Related To This Project
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Mar 10 2021
Austin, TX
Bid Date: Jul 21 2021
Apogee Building Automation System Maintenance and Repair Services at the Cedar Park Campus - 4460552
Austin, TX
Bid Date: Sep 10 2021
Austin, TX
Bid Date: Apr 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.