BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Gilbert, Arizona. Working plans call for site work for a road / highway.

As of September 17, 2024, a construction manager has been selected for the project and is in the design phase. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: This will be a Construction Manager at Risk Project pursuant to ARS Section 34-601 et seq. A general description of the Projects are as follows. The Vaughn Ventilator project to provide low speed roadway extension and additional improvements to the existing Vaughn that will transform the inactive roadway to promote a family-friendly local shopping street in the District Core. By offering a new west side access point for the Heritage District, improved circulation and access will create the environment needed for pedestrian-oriented mixeduse development. The Vaughn Ventilator will extend the Vaughn Avenue west from its existing dead end at the Union Pacific Railroad to connect to Neely Street. Improvements to the exiting roadway occur west of the proposed Paseo and existing Heritage Marketplace. The roadway section may be to Minor Collector roadway standards, modified according to the Heritage District Redevelopment Plan. The Vaughn Basin Relocation is as follows: The basin receives significant stormwater volumes for the Heritage District and is currently undersized for the service area. Project will include relocation to the north on the Town owned parcel on Neely St. north of the UPRR tracks as well as storm water It is highly recommended that all prospective Proposers attend, as Proposer responsibility issues will be discussed, along with Project requirements. . Project will include relocation to the north on the Town owned parcel on Neely St. north of the UPRR tracks as well as storm water connection under the UPRR tracks to the west for future use Total project budgets RD2190: $23,782,000 SW0122: $ 9,934,000

Pre-Construction/Negotiated

Roads / Highways

$7,235,000.00

Public - City

Paving, Site Work

25

16

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
42
Bidding Soon
1,006
All Active Projects
443
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.