Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a transportation facility in Vienna, Virginia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
https://www.bizjournals.com/washington/news/2020/04/23/metro-plans-to-close-silver-line-this-summer.html Metro said it will take advantage of lower ridership numbers created by the coronavirus pandemic and close its Silver Line this summer to connect the second phase of the western expansion to its first phase. The Washington Metropolitan Area Transit Authority, the region's transit agency, will also expand its platform rebuilding project on the Orange Line, adding East Falls Church station to the list of Vienna, Dunn Loring and West Falls Church stations it had already planned to close this summer for an ongoing systemwide project. Metro closed its Blue and Yellow lines south of Reagan National Airport last summer to rebuild platforms along that stretch. Metro said the closures will also limit the exposure of its frontline staff in the face of the pandemic, minimize delays for riders when they do return to trains and mitigate any delays in Metro's capital program. The closures will run from Memorial Day weekend through Labor Day weekend. If restrictions on businesses and stay-at-home orders in Greater Washington are lifted, Metro will not be able to reopen the stations if they're in the midst of heavy construction, according to The Washington Post. Like the station closures last summer, free shuttles will serve as a stopgap. The Silver Line work mainly involves testing of software and communication systems, according to WTOP. The first phase opened in 2014. The second phase, hit with construction problems and delays, is now likely to begin taking riders in 2021, according to reports. Ridership west of Ballston station on the Orange and Silver lines is currently down about 95%, according to Metro. The system has drastically reduced service and closed stations in recent weeks to help stem the spread of the coronavirus and protect its employees. Metro's board will discuss the summer closures at its Thursday meeting. -------------- The Washington Metropolitan Area Transit Authority (WMATA) hereby requests your participation in this solicitation, F20051/NAC Station Platform Rehabilitation Program Contract 2 (K-Line). All prospective vendors responding to this solicitation must utilize WMATA's Construction Project Management Software System (PMSS), "Procore". Procore helps to streamline the procurement process by allowing proposers to download relevant proposing documents and to then submit a proposal electronically. WMATA is seeking the services of a Design Builder to complete the design, construction, testing, and commissioning of four (4) Station Platform rehabilitation projects located on the Orange Line. The Work includes complete design, demolition, rehabilitation and construction, testing, commissioning required for the rehabilitation of the following Metro Stations: K08 Vienna; K07 Dunn Loring - Merrifield; K06 West Falls Church and K05 East Falls Church, as indicated in the RFP documents.
Post-Bid
Transportation Terminals
$200,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2019
December 30, 2019
Multiple Locations, Vienna, VA
Related To This Project
Vienna, VA
Bid Date: Sep 06 2023
Vienna, VA
Bid Date: Jul 26 2023
Vienna, VA
Bid Date: Aug 10 2023
Vienna, VA
Bid Date: Sep 06 2023
Vienna, VA
--
Vienna, VA
--
Vienna, VA
Bid Date: Nov 30 2021
Vienna, VA
Bid Date: Nov 26 2021
Vienna, VA
Bid Date: Jun 01 2023
Vienna, VA
--
Vienna, VA
Bid Date: Jun 16 2023
Vienna, VA
Bid Date: May 23 2023
Vienna, VA
--
Vienna, VA
--
Vienna, VA
Bid Date: May 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.