BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Vienna, Virginia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

https://www.bizjournals.com/washington/news/2020/04/23/metro-plans-to-close-silver-line-this-summer.html Metro said it will take advantage of lower ridership numbers created by the coronavirus pandemic and close its Silver Line this summer to connect the second phase of the western expansion to its first phase. The Washington Metropolitan Area Transit Authority, the region's transit agency, will also expand its platform rebuilding project on the Orange Line, adding East Falls Church station to the list of Vienna, Dunn Loring and West Falls Church stations it had already planned to close this summer for an ongoing systemwide project. Metro closed its Blue and Yellow lines south of Reagan National Airport last summer to rebuild platforms along that stretch. Metro said the closures will also limit the exposure of its frontline staff in the face of the pandemic, minimize delays for riders when they do return to trains and mitigate any delays in Metro's capital program. The closures will run from Memorial Day weekend through Labor Day weekend. If restrictions on businesses and stay-at-home orders in Greater Washington are lifted, Metro will not be able to reopen the stations if they're in the midst of heavy construction, according to The Washington Post. Like the station closures last summer, free shuttles will serve as a stopgap. The Silver Line work mainly involves testing of software and communication systems, according to WTOP. The first phase opened in 2014. The second phase, hit with construction problems and delays, is now likely to begin taking riders in 2021, according to reports. Ridership west of Ballston station on the Orange and Silver lines is currently down about 95%, according to Metro. The system has drastically reduced service and closed stations in recent weeks to help stem the spread of the coronavirus and protect its employees. Metro's board will discuss the summer closures at its Thursday meeting. -------------- The Washington Metropolitan Area Transit Authority (WMATA) hereby requests your participation in this solicitation, F20051/NAC Station Platform Rehabilitation Program Contract 2 (K-Line). All prospective vendors responding to this solicitation must utilize WMATA's Construction Project Management Software System (PMSS), "Procore". Procore helps to streamline the procurement process by allowing proposers to download relevant proposing documents and to then submit a proposal electronically. WMATA is seeking the services of a Design Builder to complete the design, construction, testing, and commissioning of four (4) Station Platform rehabilitation projects located on the Orange Line. The Work includes complete design, demolition, rehabilitation and construction, testing, commissioning required for the rehabilitation of the following Metro Stations: K08 Vienna; K07 Dunn Loring - Merrifield; K06 West Falls Church and K05 East Falls Church, as indicated in the RFP documents.

Post-Bid

Transportation Terminals

$200,000.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
68
Bidding Soon
1,929
All Active Projects
805
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2019

December 30, 2019

img_map_placeholder

Multiple Locations, Vienna, VA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.