BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Lorenzo, California. Completed plans call for site work for a water / sewer project.

The project contractor shall furnish all tools, equipment, apparatus, facilities, labor and material necessary to perform and complete in a good and workmanlike manner the construction of the EDGEBROOK LIFT STATION SEWER BYPASS PROJECT as shown in the project technical specifications and plans and in accordance with the contract documents within 120 calendar days of the project commencement date specified in the notice to proceed for the project. The project work is generally described as the installation of 490 linear feet of 8-inch gravity sewer to allow for the decommissioning of an existing sanitary sewer lift station. The project work includes: installation of two sanitary sewer manholes; abandonment of 540 linear feet of 5-inch sewer force main; and abandonment of 30 linear feet of 6-inch sewer main, as shown on the plans and specifications. In accordance with California Public Contract Code Section 20804.5, all bids must be presented under sealed cover and include one of the following forms of bidder's security: cash, cashier's check made payable to the District, certified check made payable to the District, or a bidder's bond. The amount of bidder's security provided must equal at least ten (10) percent of the total of the bid price for the base bid and the additive or deductive items listed in this notice. The successful bidder must submit to the District complete, executed copies of all documents specified in the contract checklist included in Volume 1 of the bid package within ten (10) working days of receiving written notice of award of the project. Bidder's security of any successful bidder that fails to do so will be forfeited to the District. The documents required pursuant to the contract checklist include, but are not limited to, a payment or labor and materials bond in an amount of at least 100 percent of the amount payable by the terms of the project contract and that satisfies the requirements of California Civil Code Section 3248, and a performance bond in an amount of at least 100 percent of the amount payable by the terms of the contract. All project bonds must be executed by an admitted surety insurer in accordance with applicable law and acceptable to the District. The Engineer's estimate is $265,000. Pursuant to California Public Contract Code Section 3300, a Class A California contractors license is required to bid on the project.

Award

Water / Sewer

$162,000.00

Public - City

Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
52
Bidding Soon
1,845
All Active Projects
779
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2019

December 2, 2019

img_map_placeholder

To Be Determined, San Lorenzo, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.