BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Moreno Valley, California. Completed plans call for the renovation of a fire / police facility.

A single story public safety building with replacement of two 60 Tons rooftop units, two sets of Liebert units, VAV boxes, as well as upgrade of building EMS Response Types Response File Subcontractor Bid Bond General Attachment Type of Award Lump Sum License Requirements C-20, DIR Registration Bid Valid 180 days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 11/23/2022 2:00 PM (PDT) Contact Info Purchasing Division (951) 413-3190 purchasingdivision@moval.org Scope of Services This RFP is for licensed and qualified Warm-Air Heating, Ventilating and Air Conditioning (C-20) to provide all labor, equipment, materials, and performance of operation in connection with the HVAC replacement project 803 0053 at the City of Moreno Valley's Public Safety Building as described in the detailed scope below. Official plans and specs are available in the documents tab of this RFP. A single story Public Safety Building for City of Moreno Valley. Mechanical scope includes replacement of two existing rooftop AC units with two new 70-ton rooftop AC units, replacement of all VAV boxes at ceiling space as well as upgrade of building EMS with Pelican control. Electrical scope includes removal and replacement of power connection to new units. Structural scope includes seismic modification of existing platform to support new rooftop units. The building requires continuous air conditioning during the construction. Common supply duct loop with manual isolation dampers from rooftop AC units are specified to allow one rooftop AC unit in operation while the other rooftop AC unit is in the process of replacement. Contractor shall coordinate with City of Moreno Valley Public Works for EMS system connections and programming, and provide miscellaneous wiring and terminations as required for a complete and operational system. Contractor shall follow City provided engineered plans for mechanical, electrical, plumbing, and structural trades as indicated in the construction documents. Upon completion of this project, HVAC system will be fully operational and code compliant. o All work to be performed during the hours of 8:00 AM to 5 PM. o Weekend work or after hour work must receive prior authorization by City of Moreno Valley Public Works. o All work to comply with plans and specifications provided. o All work shall conform to all applicable codes. o Contractors must comply with Riverside Sherriff's background check and City's insurance requirements. o Contractor to clean site daily of any debris. o Contractor to demonstrate upon completion, equipment operation. o Site will be notified of work to be performed and the impact that can be expected. o Welding screens, Vapor Barriers, Fire Extinguishers, Tape Barriers, Screens for flying debris, safety data sheet (SDS), and any other safety devices required shall be provided by the contractor and must be used at all times. o Contractor shall be responsible for returning City of Moreno Valley property (inside or out) to original, if not better state on all applicable areas of demo or new work. o Contractor shall be responsible for removal and replacement of any roofing, roof sheathing and ceilings to accommodate the new work. Materials shall match existing and roof warranties shall remain in place. o Any "or equal" submittal must be preapproved by the City of Moreno Valley in writing prior to bid. o Good workmanship is a must; all work will be inspected for compliance with City standards, compliance with construction documents and all applicable codes. All work must be of the highest standard. If you have any questions, please contact City Public Works personnel. o The successful proposer shall perform, with its own organization, Contract Work amounting to at least fifty-one percent (51%) of the Contract Price, except that any designated ""Specialty Items"" may be performed by subcontract and the amount of any such ""Specialty Items"" may be deducted from the Contract Sum before computing the amount of Work required to be performed by the Contractor.

Award

Fire / Police

$60,000.00

Public - City

Renovation

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
85
Bidding Soon
2,281
All Active Projects
903
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2022

January 6, 2023

img_map_placeholder

22850 Calle San Juan De Los Lagos, Moreno Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.