BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Milwaukee, Wisconsin. Completed plans call for the renovation of a educational facility.

In general the work consists of : EXTERIOR ENVELOPE REPAIRS: Project work includes reconstructing the brick parapets on all four (east, west, north, and south) facades; tuckpointing parapet areas that do not require reconstruction and masonry joints on all facades where required; flashing replacement on the parapets; replacement of masonry units, limestone, and sandstone crack sealants; sandstone material patching and repair for spalled and failed previously patched areas; masonry, limestone, and sandstone surface cleaning and repair and refinishing of the galvanized iron sheet metal coping and cornice elements, steel lintels, guard railings, and loading dock painting. Project work also includes significant repair and restoration work at five (5) entrances, including tuckpointing and repair of masonry walls; patching and repairing spalled sandstone elements; replacing concrete landings, steps, and pavement; installation of new hand railings and refinishing existing hand railings EXTERIOR WINDOWS REPLACEMENT: Mitchell Hall is on the Wisconsin Historical Society Architecture and History Inventory. The Project will comply with mitigation as negotiated with the Wisconsin Historical Society. In general, the window replacement work removes the existing wood windows and replaces them with prefinished thermally broken operable and fixed aluminum windows that closely replicate the original window sightlines and exterior brick mold profiles, interior trim will be standard prefinished "snap trim". The new windows will provide improved thermal and air infiltration characteristics as well as reduction of solar heat gain. The window replacement work includes complete removal of the existing wood windows, existing aluminum storm windows, existing aluminum trim, existing bird impact deterrent system, and the existing grade level security screens. The existing window air conditioning units and the existing window treatments will be removed and salvaged for reinstallation. The new replacement windows will be prefinished with a two coat 70% Kynar paint to match the original wood window paint color. The exterior brick mold and mullion cover panning will be custom extruded aluminum to match the existing original wood profiles. The windows will be factory glazed with clear Low-e insulating glass. Grade level windows located directly adjacent to grade will have laminated glass to reduce breakage potential. Existing interior plaster and gypsum board wall finish (jambs and heads) and window stools and chair rail stool casing will remain in place to the greatest extent possible, and only minimal patching is anticipated. Base Bid will be received for: A single lump sum bid for All Work. No deposit is required to obtain documents for bidding purposes. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Bid Results

Educational

$4,549,374.00

Public - State/Provincial

Renovation

38

21

22

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
46
Bidding Soon
995
All Active Projects
420
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2021

September 27, 2021

img_map_placeholder

3203 N Downer Ave, Milwaukee, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.