Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2020 at 8:00 PM

Updated September 14, 2023

Site work, new construction and renovation of a mixed-use development in Bozeman, Montana. Completed plans call for the construction of a 40,000-square-foot stadium; and 3,400-square-foot educational facility.

Bid Package #1 - Bobcat Athletic Complex - Construction of a new building and associated site work to be located in the northwest endzone of the football stadium. Bid Package #2 - Bozeman Health Tenant Improvement - Approximately 5,000 square feet of interior space on the main level will be completed under a separate, but concurrent tenant fit-out contract for Bozeman Health. The Owner reserves the right to reject any or all submissions and to waive any and all irregularities or informalities and the right to determine what constitutes any and all irregularities or informalities. The projects include building demolition, site, demolition, excavation, backfill, utilities, site construction, concrete foundations, polished concrete slabs, masonry structural steel, custom metal fabrications, interior finish carpentry, cabinets, counter tops, TPO roofing, insulation, metal, phenolic and composite wall panels, doors and hardware, coiling and overhead doors, aluminum entrances, storefronts and curtain walls, window film, framing and drywall, ceramic and tone tilling, acoustic ceilings and wall treatment, resilient flooring, athletic flooring, resinous flooring, carpeting, painting, staining, high performance coatings, division 10 specialties, food service equipment, folding and portable seating-platform risers, window shades and blinds, fixed audience seating, treatment pools, elevators, laundry chutes, fire suppression, plumbing, HVAC, electrical, communications, fire alarm, and landscaping. Addendum #1 & 2 have been issued. Addendum #3 has been issued. A revised document for addendum #3 has been issued. As of February 5, 2020, 19 addentional plan sheets have been added as part of addendum #3.

Under Construction

Educational

$11,000,000.00

Public - State/Provincial

LEED Certification, New Construction, Renovation, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2020

May 1, 2020

Project location map

1 Bobcat Cir, Bozeman, MT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed