BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Austin, Texas. Completed plans call for the renovation of a water / sewer project.

Walnut Creek Primary Clarifier-Flow Equalization Basin Rehab RFQS 6100 CLMA047. Walnut Creek Wastewater Treatment Plant (WWTP) is permitted to treat and discharge an average daily flow of 75 million gallons per day (MGD) and a 2-hour peak flow of 165 MGD. Treated plant effluent is discharged into the Colorado River. A portion is used for non-potable water (NPW) on the plant site and supplies much of the City's growing Water Reclamation Initiative (WRI) program. Primary Treatment Complex No. 1 is original to the 1977 construction, and Primary Treatment Complex No. 2 was added in the late 1980s. The purpose of this project is to rehabilitate and make improvements to the Primary Treatment Complexes (PTC) at Walnut Creek WWTP. Each Primary Treatment Complex consists of two trains of primary clarifiers and in-line flow equalization basins (FEBs). Raw wastewater flows through the primary clarifiers, then continues to the in-line FEBs. Settled wastewater is pumped to secondary treatment, and primary sludge is pumped to Hornsby Bend Biosolids Management Plant. Most of the mechanical and other components in PTC No. 1 and No. 2 are beyond their useful life. PTC1 and PTC2 each has two (2) trains, consisting of a primary clarifier and an FEB. Each primary clarifier has one (1) mechanism, and each FEB has two (2) mechanisms, for a total of four (4) primary clarifier mechanisms and eight (8) FEB mechanisms. The primary clarifiers and FEBs are located in underground structures with limited access. There are skylights located above each clarifier drive for maintenance access and there is pedestrian access at either end of each PTC. Work may require use of large cranes and modification to roof structures. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Bid Results

Water / Sewer

$4,010,383.00

Public - City

Renovation

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
36
Bidding Soon
2,399
All Active Projects
939
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.