Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and renovation of a bridge / tunnel in Chicago, Illinois. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The work for which proposals are invited consist of the rehabilitation of the Canal Street Viaduct consists of replacing the superstructure and supporting columns of the viaduct structure (Structure No. 016-6514) over Amtrak tracks and platforms of Chicago Union Station. Repairs will be made to the Chicago Union Station retaining wall which supports the superstructure. Also included is reconstruction of Canal Street pavement on grade from the south side of Harrison Street to the north side of Jackson Boulevard, including intersections and the intersection with Van Buren Street. Also included is rehabilitation work on the retaining walls along Canal Street at the Ida B. Wells Parkway underpass. The elevated viaduct structure from Van Buren to Harrison, attached to the Old Post Office, is rehabilitated by others. This includes but is not limited to structural demolition, construction of a new substructure from above the grade beams, construction of a new superstructure, retaining wall repairs and partial replacement, pavement construction, milling and resurfacing of roadway surface, roadway lighting installation, traffic signal installation, drainage system, maintenance of traffic, construction of new ADA sidewalk ramps, coordination with Amtrak as described in the detail specifications, including all appurtenant work and accessories, to the complete satisfaction of, approval and acceptance by the City. This description of work is intended to be general in nature and is neither a complete description nor a limitation on the work to be performed. Contractor shall perform all Work described in the Contract Documents or reasonably inferable as necessary to produce the results specified therein, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. CONTRACT SPECIFIC GOALS: 32% MBE 10% WBE 1% VBE
Award
Bridges / Tunnels
$20,248,642.00
Public - City
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2023
June 5, 2023
S Canal St, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Mar 09 2023
Chicago, IL
Bid Date: Mar 09 2023
Chicago, IL
--
Chicago, IL
Bid Date: May 11 2023
Chicago, IL
--
Chicago, IL
Bid Date: Mar 16 2023
Chicago, IL
Bid Date: Mar 07 2023
Chicago, IL
Bid Date: Feb 23 2023
Chicago, IL
Bid Date: Feb 23 2023
Chicago, IL
Bid Date: Mar 07 2023
Chicago, IL
Bid Date: Mar 09 2023
Chicago, IL
Bid Date: Mar 09 2023
Chicago, IL
Bid Date: Mar 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.