EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 8, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Norco, California. Conceptual plans call for the renovation of a laboratory facility.

Per the owner, as of February 8, 2022, this project has been cancelled. Closed solicitation has been included below for reference. .................. This project consists of remodeling the former woodshop in building 575 to suit the installation of a metal additive manufacturing lab. This lab will utilize metal powders, some highly reactive and explosive, to create three-dimensional components using laser sintering. The space must therefore conform to NFPA 484 and UFC 3-600-01. This will require updating electrical, wall and ceiling construction and the addition of an electrical closet. The metal sintering process also requires the use of inert gas atmosphere so installation and plumbing of Nitrogen and argon lines will also be necessary. Finally, the new equipment will need to be connected and commissioned to begin use. The method of contractor selection has not been determined at this time.

Project Abandoned

Laboratories

$10,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Terrazzo Flooring
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Emergency Lighting

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
123
Bidding Soon
2,416
All Active Projects
1,000
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

img_map_placeholder

1999 Fourth St, Norco, CA


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

3D Metal Additive Upgrade Lab

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.