BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Fort Worth, Texas. Completed plans call for the renovation of a transportation facility.

As of January 10 the project has not been awarded yet After evaluating the Proposals submitted, the City shall select the Offeror that offers the Best Value to the City and enter into negotiations with that Offeror. The City may discuss with the selected Offeror options for a scope or time modification and any price change associated with such modification. The last day for questions from prospective Offerors is at 5:00 PM on Wednesday, November 6, 2019. The offers will be valid for ONE HUNDRED TWENTY (120) calendar days. There are no Alternates for this project. The Offeror will add a 7.5% Owners Contingency Allowance on a separate line item on the Proposal form and only the Owner will approve the use of this allowance during construction. Any Allowance remaining at the end of construction will be retained by the City of Fort Worth. This Allowance is not to be included in the Base Proposal and will not be used in the Best Value selection process. Refer to the evaluation matrix for the selection of the Best Value Offeror in the Instructions to Offerors. Refer to the Request for Proposal documents for the Minority Business Enterprise (MBE) Information. MBE participation will be evaluated in awarding this Contract. The MBE participation goal is 10%. Offerors must submit the attached Best Value Utilization Form within 5 business days of submitting their Best Value Proposal. Failure to document proposed attainment will remove the Proposal from further consideration. Offerors must submit a bid bond with their proposal. Offeror(s) to whom an award of contract(s) is made will be required to provide Payment and Performance Bonds and provide Contractors General Liability and Statutory Workers Compensation Coverage. If you intend to submit a Proposal, request you inform the Project Manager or Architect/Engineer who can then inform the interested subcontractors. General Contractors and Suppliers may make copies of the Instructions to Offerors, General Conditions,Drawings, and Specifications through their printer. For Construction Documents information contact the Project Engineer, Mr. Kerry McLeroy, at (817) 878-4242 or email klm@summitmep.com.Contact the City of Fort Worth Project Manager, Alfonso Meza, at (817) 392-8274 or email Alfonso.Meza@fortworthtexas.gov for assistance. In general, the work of this Contract comprises general, plumbing, mechanical and electrical demolition and construction work of the following: 1. Replacement of the majority of the mechanical systems in the building. 2. Electrical and Plumbing work is included to provide support for the mechanical work.

Bid Results

Transportation Terminals

$965,547.00

Public - City

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
97
Bidding Soon
3,587
All Active Projects
1,427
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.