Published January 3, 2022 at 7:00 PM

Updated September 15, 2023

Demolition and addition to a water / sewer project in Palm Coast, Florida. Completed plans call for the addition of a water / sewer project; and for the demolition of a water / sewer project.

QUESTION DEADLINE: November 19, 2021 at 2:00 PM Intent to Bid Due Date: Dec 15th 2021, 2:00 PM EST The project consists of one contract for construction of Wastewater Treatment Facility No.2 (WWTF No.2) Expansion from 2.0 MGD to 4.0 MGD for the following major components: 1. Headworks - grit removal, screen equipment, and odor control 2. Flow equalization tanks with aeration and mixing equipment and flow equalization pumping system 3. AWT biological treatment process using MBR, including anaerobic basins, pre-anoxic basins, aerobic basins, post-anoxic basins and MBR basins 4. Chlorine contact chambers 5. Reclaimed water transfer and high service pumps 6. Sludge holding tanks and associated aeration and mixing system and pumping equipment 7. Chemical feed systems including alum, Micro-C, sodium hypochlorite, and other chemical storage and feed systems 8. Any other components associated with the complete expansion of the WWTF No.2 that are indicated in the contract documents (plans and specifications) C. Kubota will furnish the WWTF No.2 expansion treatment process equipment and materials as indicated in the contract documents (plans and specifications) and the General Contractor shall be responsible for the installation and startup of this equipment. The General Contractor shall be responsible to furnish and install all other WWTF No.2 expansion equipment and materials shown on the contract documents. D. Omission of a specific item or component part of a system obviously necessary for the proper functioning of the system shall not relieve the Contractor of the responsibility of furnishing the item as part of the work at no additional cost to the City. E. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements and restoration required as a result of damages caused during this construction. F. The Contractor shall comply with all Federal, State and local laws, rules and regulations which are applicable to this Project. MATERIAL AND WORKMANSHIP BOND -(10% of Final Contract Price) Intent to Bid Due Date: Dec 15th 2021, 2:00 PM EST An Engineer's estimate or budget for this project is $15,000,000 to $18,000,000.

Award

Water / Sewer

$24,695,000.00

Public - City

Addition, Demolition

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
116
Bidding Soon
1,882
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

February 14, 2022

Project location map

To Be Determined, Palm Coast, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.