Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, renovation and addition to an educational facility in Rolla, Missouri. Completed plans call for the addition of a 86,470-square-foot educational facility; and for the renovation of a educational facility.
shall consist of the review and ranking of each respective firm’s qualifications and responses to the university’s selection criteria as stated herein. This is a competitive process with points awarded for each category of the selection criteria. The university will utilize a review panel to evaluate the offerings and establish a preliminary ranking of the firms. Five or fewer firms with the highest preliminary ranking based on the firm’s responses to the selection criteria will be interviewed by the owner’s panel. At a minimum, the proposed project director/executive, senior project manager(s), scheduling manager(s), assisting project manager(s) and superintendent(s) shall attend the interview. The interview will include introductions with each proposed staff member summarizing their responsibilities and experience, followed by a question-and-answer session conducted by the Owner. The questions will not be provided prior to the interview. The respondent will be allowed fifteen minutes to present information supporting their response to this RFQ, followed by a question-and-answer session for the balance of the interview. Following the establishment and ranking of the short-listed firms, the RFP documents will be issued to the short-listed firms. The short-listed firms shall submit their cost proposal in a sealed envelope, including their construction phase fee, lump sum cost for fulfilling the general conditions, cost of insurance and cost of performance and payment bonds, all in accordance with the step two provisions. The Preconstruction Services scope shall be included as provision D.2. and the Preconstruction Fee shall be included in provision D.5., both as indicated on the contractor’s agreement. The final selection of the construction manager at risk will be based on a 25,000 - point system. Forty percent (40%) (10,000 points) will be awarded as established by the review panel based on qualifications, responses to the university’s selection criteria, references, the Owner’s prior experience with the respondent, and the interviews, all under a competitive process. Three hundred (300) bonus points will be awarded to an SDVE proposer. The 300 bonus points will be added to the SDVE’s qualifications score as established by the Owner’s review panel. The 300 bonus points are available only to an SDVE firm submitting a proposal directly to the Owner. The remaining sixty percent (60%) (15,000 points) will be awarded based on the sum total of, the construction phase fee, the lump sum for fulfilling the general conditions, the cost of insurance and performance and payment bonds and preconstruction fee. For evaluation purposes, the construction phase percentage fee will be multiplied by the anticipated construction budget to establish the overhead and profit component of the price. The lowest total price submission will receive 15,000 points. Ascending price submission totals from other firms will be awarded price points on a pro rata basis. The owner reserves the right to seek clarifications. Contract award November 17, 2023 Phase 1 (addition) Construction Start October 2024 Phase 2 (renovation) Construction Start November 2024
Post-Bid
Educational
$38,500,000.00
Public - City
Addition, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2023
October 1, 2024
300 W 13th St, Rolla, MO
Related To This Project
Rolla, MO
Bid Date: Jun 30 2022
Rolla, MO
Bid Date: May 03 2022
Rolla, MO
Bid Date: Aug 11 2022
Rolla, MO
Bid Date: Jun 23 2022
Rolla, MO
Bid Date: Aug 12 2022
Rolla, MO
Bid Date: Jul 27 2022
Rolla, MO
Bid Date: Mar 06 2019
Rolla, MO
Bid Date: Jan 10 2022
Rolla, MO
Bid Date: Jun 28 2022
Rolla, MO
Bid Date: Jul 06 2022
Rolla, MO
Bid Date: Jul 11 2022
Rolla, MO
Bid Date: Sep 21 2020
Rolla, MO
Bid Date: Feb 16 2022
Rolla, MO
Bid Date: Jun 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.