BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lawrence, Massachusetts. Completed plans call for site work for a water / sewer project.

This Project includes, but is not limited to, design, replacement, and rehabilitation of the existing sewer collection system including lining of 8,050 linear feet of sewer main and replacement of 4,780 linear feet of sewer main identified to address structural pipe failures and reduce infiltration and inflow sources to the collection system; and all materials and equipment, services and construction inherent to the Work. The Project being bid is subject to Massachusetts General Laws, Chapter 30, Section 39M and prevailing wage rates as issued by the Director of the Executive Office of Labor and Workforce Development, Department of Labor Standards under the provisions of Massachusetts General Laws, Chapter 149, Sections 26 to 27D inclusive, as amended, apply to this Project. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, not to be responsible or eligible or not to meet the specified qualification or quality requirements, based on poor references or otherwise. Owner may also reject the Bid of any Bidder if Owner reasonably believes that it would not be in the best interest of the Project or the public to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. Disadvantaged Business Enterprise (DBE) goals are not applicable to this Project. The fair share goals for disadvantaged business enterprise (DBE) participation for this Contract are a minimum of 4.20 percent Disadvantaged Minority Business Enterprise (D/MBE) participation and 4.50 percent Disadvantaged Women Business Enterprise (D/WBE) participation, applicable to the total dollar amount paid for the construction Contract. The Contractor shall take all affirmative steps necessary to achieve this goal, and shall provide reports documenting the portion of Contract and subcontract dollars paid to DBEs, and its efforts to achieve the goals, with each invoice submitted or at such greater intervals as specified by the Owner. The Contractor shall require similar reports from its Subcontractors.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
147
Bidding Soon
2,696
All Active Projects
1,118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2019

January 2, 2020

img_map_placeholder

Multiple Locations, Lawrence, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.