BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a playground / park / athletic field in Doral, Florida. Completed plans call for site work for a playground / park / athletic field; and for the construction of a playground / park / athletic field.

The project referenced as part of this RFP principally consists of the construction of approximately 2.7 acres of land located north of NW 41st Street and west of theoretical NW 84th Ave within the Downtown Doral South development. The future White Course Park will include a shaded playground (Refer to Exhibit E for more information), a waterfront flexible event plaza, artificial turf putting green space, outdoor fitness stations, two (2) off-leash fenced artificial turf dog areas with washing stations, putting, multi-purpose greenspace, concrete paver walkways, and concrete sidewalks, an aluminum fence around the park, and chain-link the fence around the playground and dog off-leash areas. This pedestrian-friendly park will include 11 parking spaces with a right-in right-out parking lot access (refer to Exhibit F for more information). In addition, the park will also offer connectivity to Downtown Doral through the Downtown Doral Boardwalk located at the north side of the park. The proposed waterfront boardwalk design and construction is not included as part of the project scope and was completed by others in late 2020. Solicitations may be found via the City of Doral website under Procurement. To obtain the solicitation interested parties must follow the link to download the document. Phase I Evaluation: November 19th, 2020 at TBD Phase II Evaluation: December 1st, 2020 at TBD Addendum #1 has been issued. Addendum #2 has been issued. ***Late arrivals will not be permitted to join the conference and therefore forfeits all opportunities to bid on this project. During this conference all work will be discussed. The Procurement Division will respond to all questions submitted during the pre-bid conference by issuance of a written addendum to the RFP. The City reserves the right to delay or modify scheduled dates and will notify Bidders of all changes in scheduled dates. The City of Doral reserves the right to accept any bid deemed to be in the best interest of the City or to waive any informality in any submittal. The City may reject any or all bids and re-advertise. Bid Result : PHASE I : WAYPOINT CONTRACTING INC : Score - 280 PHASE II : GEC ASSOCIATES : Score -278

Award

Playgrounds / Parks / Athletic Fields

$2,900,000.00

Public - City

New Construction, Site Work

102

11

15

3

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
45
Bidding Soon
1,102
All Active Projects
491
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.