Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Richfield, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and bridge / tunnel.
As of January 24, 2020, Michels Corporation had the low bid on the project at $1,276,883.86. The anticipated start date on the project is April 13, 2020. The project was awarded to the lowest bid Michels Corporation had the low bid on the project at $1,276,883.86.. For County Trunk Highway (CTH FD / Pioneer Road) Reconstruction Approximate quantities are as follows: Excavation Common 13,800 CY Base Aggregate Dense 10,000 TON Breaker Run 15,800 TON HMA Pavement 4,600 TON Culvert Pipes 485 LF Storm Sewer 520 LF Concrete Curb & Gutter 2,650 LF Topsoil & Salvaged Topsoil 15,700 SY Epoxy Pavement Markings 14,500 LF The project is expected to begin April 13, 2020 and shall be substantially completed by July 17, 2020, and shall be fully completed by July 31, 2020. Construction time is of the essence. Completion delays are subject to liquidated damages. Bid Bond (Required) - No bid shall be received unless accompanied by a certified check or bid bond equal to five (5%) percent of the bid, payable to Washington is accepted, the successful bidder will execute and file the contract within ten (10) days after the award of the contract. If you are submitting a 5% certified check in lieu of the bid bond, include a completed and signed copy of your firm's current W-9 Form with your sealed bid. In case the bidder fails to file such contract, the amount of the check or bid bond shall be forfeited and become the property of Washington County. Failure to submit the required bid security as part of the firm's sealed bid will result in immediate rejection of the firm's bid. The accepted bidder will also be required, as a condition precedent to award of contract, to furnish in the amount of 100% of the contract price, satisfactory Performance & Payment Bonds and Certificate of Insurance. As per section 2015 Act 55, the County is not required to establish a rate of wage scale for this project. Bids shall be submitted on the bid forms provided and all blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. All bidders must include the "Bidders Qualification Statement," as part of their sealed response. If the Bidder Qualification Statement is missing, the bid may be rejected. Washington County reserves the right to waive any informalities or technicalities and to reject any and all bids or parts thereof deemed to be unsatisfactory or not in the County's best interest. Furthermore, Washington County reserves the right to cancel any order or contract for failure of the successful bidder to comply with the terms, conditions and specifications of the bid request and/or contract. Washington County reserves the right to award the bid in the aggregate or by item or like item groups (where applicable) to the lowest responsible, responsive bidder who complies with the specifications, service and can meet the requirements of this request.
Award
Roads / Highways
$1,276,884.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2019
April 13, 2020
Multiple Locations, Richfield, WI
Related To This Project
Richfield, WI
Bid Date: May 10 2022
Richfield, WI
--
Richfield, WI
Bid Date: Feb 07 2023
Richfield, WI
Bid Date: Aug 09 2023
Richfield, WI
Bid Date: Dec 21 2023
Richfield, WI
--
Richfield, WI
Bid Date: Apr 09 2024
Richfield, WI
Bid Date: Mar 19 2024
Richfield, WI
Bid Date: Apr 23 2020
Richfield, WI
Bid Date: Apr 18 2022
Richfield, WI
Bid Date: Mar 15 2022
Richfield, WI
Bid Date: Sep 07 2021
Richfield, WI
Bid Date: Oct 17 2022
Grafton, WI
Bid Date: Jan 30 2020
Racine, WI
Bid Date: Jan 16 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.