BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Champaign, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of February 22, 2024, an engineer has been selected for the project. Construction timeline has not been identified. *The closed solicitation has been included below for reference: This project may contain Federal Funds. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all subconsultants the prime Consultant will be using are scheduled to attend an initial meeting on February 4, 2020 at 1:30 PM at the Region Three/District Five Office in Paris. Phase I and II engineering services are required for the preparation of a project report (anticipated to be a categorical exclusion) and final contract plans, specifications, and cost estimates for the 3R Policy Resurfacing, Widening Existing Pavement, Intersection Reconstructions, ADA improvements, new curb and gutter, drainage improvements, traffic signal modernization, roadway diet and bicycle lanes on US 150 (Prospect Ave) from I-74 Interchange to ILL 10 (Springfield Ave) in Champaign. The prime firm must be prequalified in the Highways (Roads & Streets) Special Studies (Location Drainage) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Prequalification Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. Request for Qualifications for inspection services is underway IDOT - RFQ Engineering - US 150 From I-74 Interchange to ILL 10 (Springfield Ave) in Champaign, Phase I and II Engineering Services *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Award

Roads / Highways

$15,500,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
29
Bidding Soon
511
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2022

img_map_placeholder

US-150, Champaign, IL

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.