Demolition, site work, paving and new construction of a mixed-use development in Fort Meade, Maryland. Completed plans call for the construction of a 410,000-square-foot military facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for the demolition of a 134,000-square-foot military facility.
As of July 21, 2022, design of project is underway. Demolition and breaking ground is scheduled for January 2023 and the design phase is schedule to complete September 2023. Contract Award Date: May 24, 2022 Contract Award Number: W912DR-22-C-0018 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: GPYDJ1NKULS8 Contractor Awarded Name: HENSEL PHELPS CONSTRUCTION CO. Contractor Awarded Address: Tysons Corner, VA 22102-4872 USA Base and All Options Value (Total Contract Value): $302242000.00 Records Center Replacement (RCR) and Mercury Flora (MCF) Facilities, Fort George G. Meade, MD. Project Description: Design and construct two (2) new, separate, State-of-the-Art structures/buildings known as Records Center (RCR) and Mercury Flora (MCF) on Fort George G. Meade, Maryland. The two buildings are in the general vicinity of each other and will share the same site. In addition, to provide space for RCR/MCF, the scope also includes full structural demolition of one large aging existing warehouse/administration facility (Approx. 132,000 SF) and five other smaller existing out-buildings (Approx. 11,000 SF total). The RCR facility is an 85,000 SF multi-story administrative and warehouse structure for staff to perform records management functions. This facility will include secure access, administrative areas, office areas, shared workstations, conference rooms, break rooms, lockers, high-bay, humidity-controlled records storage module with cold storage rooms. The storage area will have super-flat concrete floors, fixed shelving and open storage spaces. There will also be supporting warehouse spaces for shipping and receiving, decontamination, records staging, packaging, and forklift charging. The MCF facility is a 250,000 SF multi-story administrative and warehouse structure to support light industrial warehouse and administrative functions. This facility will include secure access, high-bay, loading dock, industrial workshops, IT rooms, lobby, administration areas, office areas, conference areas, break rooms, cafe, storage areas, and an on grade corridor connection to another existing facility. Both facilities consists of core and shell structure and foundation; electrical/mechanical service and distribution components and systems; fire protection, alarm and suppression; information technology infrastructure, communications, and security support infrastructure; exterior finishes and weatherproofing. Interior build out will provide raised access floor systems, acoustically-rated interior partitions and ceilings, power, lighting, environmental control and communications. Both facilities will be built to ICD-705 Sensitive Compartmented Information Facility (SCIF) standards. MCF and RCR includes redundant primary power and Uninterruptable Power Supply (UPS) and Uninterruptable Mechanical Supply (UMS) systems to ensure continuity of operations. Site infrastructure for both facilities will include primary electrical service to the site, water, sewer, stormwater and telecommunications pathways. The supporting facilities include, site preparation and telecommunication improvements, utility services, perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, courtyards and roads. Perimeter security reconstruction and extension is required with road improvements. Both Facilities will strive to meet LEED Silver certificate and comply with the Energy Policy Act of 2005 and the Energy Independence and Security Act of 2007. Low Impact Development will be included in the design and construction of this project as appropriate. Acquisition Description: This is a competitive acquisition for the award of a Fixed Price Award Fee (FPAF), Two-Phase Design-Build (DB) construction C-type contract. It is anticipated to be solicited on an unrestricted basis. The contract will be awarded to the Offeror whose proposal represents the "Best Value" to the Government based on the tradeoff process in Phase I and II. The best value determination will be based on a comparative assessment of proposals against all source selection criteria in the solicitation, considering recommendations and any minority opinions presented to the Source Selection Authority (SSA). While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA's independent judgment. This is Phase I of a Two-Phase request for proposal (RFP) issued in accordance with FAR Subpart 36.3. This RFP is requesting submission of proposals under Phase I submission criteria ONLY. After evaluating Phase I proposals, the contracting officer will select the most highly qualified Offerors and request that only those Offerors submit proposals for Phase II. It is the Government's intention to advance up to three (3) of the most highly qualified Offerors from Phase I to Phase II.
Award
Military
$302,242,000.00
Public - Federal
Demolition, LEED Certification, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2020
January 30, 2023
To Be Determined, Fort Meade, MD
Related To This Project
Fort Meade, MD
Bid Date: Aug 04 2022
Fort Meade, MD
Bid Date: Aug 19 2022
Fort Meade, MD
Bid Date: Jul 13 2023
Fort Meade, MD
--
Fort Meade, MD
Bid Date: Aug 18 2023
Fort Meade, MD
--
Fort Meade, MD
--
Fort Meade, MD
Bid Date: Jun 30 2022
Fort Meade, MD
Bid Date: Mar 25 2021
Fort Meade, MD
Bid Date: Apr 18 2022
Fort Meade, MD
Bid Date: Feb 03 2023
Fort Meade, MD
Bid Date: Feb 01 2023
Fort Meade, MD
Bid Date: Oct 14 2022
Fort Meade, MD
Bid Date: Aug 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.