BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2020 at 8:00 PM

Updated November 15, 2023

Site work, paving and renovation of a civil project in Land O Lakes, Florida. Design plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

As of October 14, 2020, public comments are being requested for this project and a task force has been created to address the community concerns raised. A final report will be submitted to the governor and the Legislature by November 15th. There is no timeline for when this project may begin construction, but is required to start by December 31, 2022. There will be no Architect chosen since it is Civil Project Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response, Technical Proposal, and Oral Presentation Professional Liability Insurance : $2,250,000.00 TRC Members (Subject to Change) : Jason Peters Ryan Asmus Will Watts It is the policy of FDOT to encourage the participation of small businesses and disadvantaged business enterprises ("DBE") in all facets of the business activities of FDOT, consistent with applicable laws and regulations. FDOT has established an aspiration goal of 10.65% DBE usage and an additional 3% non-DBE Small Business usage for the subject Project Southwest Florida PD&E/Design - A An Organizational Chart must be submitted with the Letter of Response. Organizational chart can be either 8.5x11 or 11x17, at the discretion of the Consultant. Organizational charts are not restricted on font size or margin. All other submittal requirements for Letters of Response must be adhered to. ************************************************************ Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing lindsey.ballance@dot.state.fl.us ************************************************************ TRC Members are subject to change. Special instructions for the Letter of Response for this advertisement contract, Ad No. 20266: The content of the Letter cannot go beyond Page 3 of the Professional Services Letter of Response Form No. 375-030-22. Letter content exceeding page 3 of the Form will be found non-responsive. Pages 4, 5, and 6 of the Form are reserved for the table listing prime and subconsultants by work type. The tables listed on Pages 4, 5, and 6 of the Letter of Response form may be replicated for the sole purpose of listing additional subconsultants, as needed. No other content may be added on these pages, and the Letter of Response shall not be extended for any purpose other than as described herein. Eligibility Restriction: Consultants who are primes on the M-CORES Owner's Representative contracts are precluded from competing for the PD&E Segment A contracts as a prime. The prime consultant selected as #1 ranked for the subject contract is not eligible for award of the remaining two M-CORES PD&E/Design contracts for Segment A. Fee Proposal: This contract has a compressed procurement and negotiation schedule due to the need to meet production schedules. The selected consultant must submit a fee proposal within one week of the Final Selection date. Technical Review Committee Meeting 1 Date/Time 2/18/2020 07:00 pm Shortlist Selection Date/Time 2/25/2020 07:00 pm Scope Meeting Date/Time 2/27/2020 01:30 am Technical Review Committee Meeting 2 Date/Time 3/09/2020 11:00 pm Phase II Submittal Deadline Date/Time 3/11/2020 11:30 pm Technical Review Committee Meeting 3 Date/Time 3/21/2020 01:00 am Final Selection Date/Time 4/06/2020 07:00 pm Negotiations Period Begin Date 4/10/2020 Negotiations Period Ending Date 5/09/2020 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Suncoast Connector PD and E/Design - A

Design

Bridges / Tunnels

$40,000,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
164
Bidding Soon
2,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2021

Project location map

To Be Determined, Land O Lakes, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.