BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Spokane, Washington. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

**As of July 1 2021, the bid date was moved on 7/14/2021 The general nature of the Work is as follows: The Work includes construction of a new railroad yard and runaround track to serve a freight loading and circulation station, a vehicle access driveway to provide vehicle freight access to the paved transload circulation area, fencing, a small operation building and utility and drainage improvements, including site lighting, drainage treatment and disposal and water and sanitary sewer infrastructure improvements. Questions during the bid period and inquiries regarding bid results (after bid opening) should be directed to the Planning & Engineering Department of Spokane Airports, Monday through Friday, between 8:00 a.m. and 4:30 p.m. by contacting Colin Hayden at (509) 455-6413 or chayden@spokaneairports.net. A contract according to the General Conditions, Supplementary Conditions, and Addendums (if applicable) shall be signed prior to work commencing. Each bid must be accompanied by a cashier's check or surety bid bond, in an amount of not less than five percent (5%) of the total bid for all bid schedules (including sales tax). A performance bond, payment bond, and liability insurance in accordance with the contract documents will be required for the Contract. This is a prevailing wage project per applicable State Law and Federal Law. The Spokane Airport Board reserves the right to reject any and all bids, to waive any informality, to accept any alternate bids, and to make such award that it deems to be in the best interest of the Airport pursuant to the terms of the Instruction to Bidders and General Conditions. The contract will be awarded to the lowest responsive and responsible bidder. All bidders are cautioned to be aware of the requirement to have their bids considered responsive. Spokane International Airport is an Equal Opportunity Employer and encourages Women, Minority, Disadvantaged Business Enter-prises and small businesses to participate in the competitive bidding process. Project Estimate: $12,000,000 - $13,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Transportation Terminals

$11,132,143.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
2
Bidding Soon
104
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.