BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Flagstaff, Arizona. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.

Tracs No 040 CN 191 H8777 01C Project No 040-C(217)T Termini Ashfork -Flagstaff Highway (I-40) Location West Flagstaff TI Overpass EB/WB Route No. Milepost District Item No. I-40 191.36 to 191.92 Northcentral 55214 The amount programmed for this contract is $9,800,000. The location and description of the proposed work are as follows: The proposed work is located in Coconino County on Interstate 40 at west Flagstaff TI Overpass at milepost 191.69, approximately 3.75 miles west of the I-17 / I-40 System Traffic Interchange. The work consists of replacing existing 3-span concrete T-girder bridges in eastbound and westbound direction with new single-span precast, prestressed AASHTO Box Beam bridges. The work includes widening of approach roadway, replacing guardrail, replacing pavement markings and other related work. The time allowed for the completion of the work included in this contract will be 400 working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 5.44. To submit a valid bid, the bidder must (1) have prequalification from the Department as necessary for the project, and (2) be included on the project Plansholder List as a Prime. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. If a request for approval to bid as a Prime Contractor is received less than 48 hours prior to bid opening, the Department cannot guarantee the request will be acted on. This contract is subject to the provisions of Arizona Revised Statutes Section 42-5075 --Prime contracting classification; exemptions; definitions. No award will be made to any contractor who is not a duly licensed contractor in accordance with Arizona Revised Statutes 32-1101 through 32-1170.03. All labor employed on this project shall be paid in accordance with the minimum wage rates shown in the General Wage Decision. These rates have been determined in accordance with the requirements of the law and issued by the Secretary of Labor for this project. The wage scale is on file in Contracts and Specifications Section and copies may be obtained at all reasonable times. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. Questions and comments concerning the bid package for this project shall be directed to the individuals noted below: Engineering Specialist: Construction Supervisor: Vian Rashid (VRashid @ azdot.gov) Steve Monroe (SMonroe@azdot.gov) AZDOT - Ashfork - Flagstaff Highway (I-40) (West Flagstaff TI Overpass EB/WB)

Award

Bridges / Tunnels

$6,489,938.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

251

1

13

10

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
1
Bidding Soon
68
All Active Projects
21
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2020

February 9, 2021

img_map_placeholder

I-40, Flagstaff, AZ

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.