BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2026 at 7:00 PM

Updated January 6, 2026

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Henrico, Virginia. Completed plans call for the construction of a educational facility; for the demolition of a educational facility; for site work for a educational facility; playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

VDOE #043-69-00-102 The Work consists of the construction of an approximately 180,000 sf three-story middle school and with associated sitework, co-located on the site of the existing Quioccasin Middle School, and the demolition of the existing Quioccasin Middle School. The new middle school building consists of a structural system with a combination of loadbearing CMU and steel framing. Interior partitions include CMU, drywall and limited amounts of wood veneer paneling. Flooring includes polished concrete, carpet tiles, wood sports and stage flooring and rubber floor tile. Roofing systems include EPDM membrane. Building features include kitchen with food service equipment, dining commons, a main gymnasium, an auxiliary gymnasium, 500-seat auditorium, library, general classrooms, career technical and technology areas, Innovation Center areas and classrooms, Family and Community Engagement office area and administration areas. The building has been designed to achieve LEED Silver certification and will require coordination with LEED requirements. Site construction includes the construction of a new bus loop, bus canopy and new parking area including all grading, erosion and sediment control, stormwater management, site utilities, driveways, paving and sidewalks, fencing, site lighting, signage and landscaping. Demolition of the existing school may require hazardous material abatement. A hazardous materials study has been provided by the owner and is included as a part of the bid documents. New athletic facilities include a new baseball field, softball field, tennis courts, and multipurpose field. Sports lighting is included for the athletic fields. The project consists of two general phases: Phase 1 consists of the construction of the new middle school, bus loop and canopy and partial site work and parking areas as indicated in the Contract Documents. The existing middle school will be occupied and remain in operation during the entire period of construction; Phase 2 consists of the demolition of the existing middle school and associated sitework, the construction of the new Baseball field, softball field, tennis courts, multipurpose field and the balance of sitework and parking. The new middle school will be occupied and remain in operation during the entire period of this phase. Project is located at 9400 Quioccasin Road, Henrico VA, 23238. Question deadline: 8/27/25 at 11:59 PM Direct any questions concerning the Project Manual and Drawings in writing through the Questions function in ProcureWare.

Award

Educational

$84,992,000.00

Public - County

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

552

32

441

6

Subscribe For Documents

95 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
3
Bidding Soon
768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

November 11, 2025

Project location map

9400 Quioccasin Rd, Henrico, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.