Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Wilmington, Massachusetts. Working plans call for the renovation of a water / sewer project.
As of January 6th, 2021 the bids for this project have been rejected. The owner has stated the bids were over budget and the project will not be awarded. Work to be performed under this Contract includes, but is not limited to, providing all materials, equipment, labor and supervision to: remove and replace approximately 60 linear feet of 15-inch gravity sewer; install cured-in-place spot repair (CIPSR); furnish and install a new sewer manhole with an access hatch, new channel grinder, a rail system to raise and lower said channel grinder, new grinder control panel, buried electrical conduit and wiring, new fencing, new access gate, new trees/shrubs, and all associated site work and appurtenances. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified. The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item. Scope: 1. CONTRACTOR shall provide and maintain methods, equipment, and temporary construction as required to control environmental conditions at the Site and adjacent areas. 2. Maintain controls until no longer required. 3. Temporary controls include, but are not limited to, the following: a. Erosion and sediment controls. b. Dust control. c. Pest and rodent control. d. Control of water, including stormwater runoff. e. Pollution control. Pilcher Drive Pump Station Grinder - Installation of new sanitary sewer manhole along an existing gravity sewer, installation of new wastewater grinder unit, and associated electrical work.
Final Planning
Water / Sewer
$169,999.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2020
January 29, 2021
1A Pilcher Drive, Wilmington, MA
Related To This Project
Wilmington, MA
Bid Date: Feb 13 2020
Wilmington, MA
--
Wilmington, MA
Bid Date: Feb 02 2023
Wilmington, MA
Bid Date: Jan 26 2022
Wilmington, MA
Bid Date: Mar 08 2023
Wilmington, MA
Bid Date: Nov 22 2023
Wilmington, MA
--
Wilmington, MA
Bid Date: Jan 26 2022
Wilmington, MA
Bid Date: Jul 22 2021
Wilmington, MA
Bid Date: Aug 11 2022
Wilmington, MA
Bid Date: Apr 26 2023
Wilmington, MA
Bid Date: Jun 23 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.