Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of an educational facility in Rohnert Park, California. Conceptual plans call for the demolition of a educational facility; for the construction of a 120,000-square-foot educational facility; and for site work for a educational facility.
This project will construct a new 120,000 GSF building that will be the future home for Arts and Humanities. This project includes the demolition of the existing 20,000 GSF Rachel Carson Hall (#8), built in 1975, and the existing Art Building (#19), built in 1977. Both buildings have not had significant renovations and are at the end of their useful life with spaces that do not serve modern day teaching and learning. As of February 20, 2020, this project is currently in the FY 2022/2023 - 2026/2027 CIP. Information regarding design team and contractor selection has not been disclosed. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Educational
$200,929,000.00
Public - State/Provincial
Demolition, New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2023
1801 E Cotati Ave, Rohnert Park, CA
Related To This Project
Rohnert Park, CA
Bid Date: Jan 26 2022
Rohnert Park, CA
Bid Date: Feb 24 2022
Rohnert Park, CA
Bid Date: Feb 15 2022
Rohnert Park, CA
Bid Date: Mar 02 2022
Rohnert Park, CA
Bid Date: Dec 29 2021
Rohnert Park, CA
--
Rohnert Park, CA
Bid Date: Jul 07 2022
Rohnert Park, CA
--
Rohnert Park, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.