EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Knoxville, Tennessee. Completed plans call for the renovation of a 182,100-square-foot, four-story above grade educational facility.

The work will include basic overall building upgrades for restrooms, offices and student workspace, security, HVAC system, and electrical. As of February 16, 2022, an architect has been selected, and the drawings are in the design development phase. A timeline for bidding and construction has yet to be announced. All questions must be received by the Architect by Friday, August 5 in order to be answered. Questions must be in writing and faxed to 865-637-1532, or by email to lingram@breweringramfuller.com. It is unlikely that addenda will be issued after Monday, August 8. A brief description of the Base Bid Work covered by the Contract Documents is provided below. Alternates, if any, are described elsewhere. Base Bid Work includes: Renovation of eight (8) existing restrooms and their vestibules. Renovation of four (4) existing exit stair landings as Areas of Refuge. (Building is existing and sprinklered. These Areas of Refuge are an elective upgrade requested by Owner as an accommodation to enhance accessible features.) Painting and electrical renovations in Graphics Studio Room 335. Related improvements in the Work Areas as follows: 1. Demolition of walls, flooring, ceilings, doors and fixtures as indicated on drawings. Removal and disposal of existing materials scheduled to be replaced are included in this contract unless specifically noted otherwise. 2. Add new walls, flooring, ceilings, doors and fixtures where indicated on drawings. 3. Paint interior walls, metal doors and hollow metal frames, both new and existing, as noted in the Finish Schedule. Existing surfaces scheduled for painting shall be repaired/patched wherever damaged, and prepared for painting as specified. 4. Add new ceramic tile flooring and wall finishes as and where indicated on drawings. Existing surfaces scheduled for new ceramic tile systems shall be repaired/patched wherever damaged, and prepared for new materials as specified. 5. Add new ceiling systems as and where indicated on drawings. 6. Add new casework as and where indicated on drawings. Add fire-treated 2x wood blocking in walls where required for support of wall-mounted items. 7. Clean new and existing interior finishes and fixtures such as doors, hardware, storefront, glass, mirrors, casework, ceramic tile, plumbing fixtures, HVAC grilles and registers, light fixtures, etc. 8. Coordinate with Owner for temporary relocation and re-installation of Owner's furniture. Final layout of furniture in Room 335 shall be as indicated on furniture drawings by others, see Section 00 30 00. 9. Plumbing work as indicated for new fixtures, and other plumbing work as noted on drawings. Inspection, repair and adjustment of plumbing system components to remain. 10. HVAC work as indicated, to renovate existing restroom central exhaust system, with new equipment and extensions of ductwork. Inspection, repair, test, balance and adjustment of this system. 11. Adjust and add sprinklers to meet NFPA 13. 12. Electrical work as indicated, to modify and supplement existing power, lighting, data, security, and communication systems The apparent low bidder was Wright Contracting, Inc.

Award

Educational

$1,190,000.00

Public - State/Provincial

Renovation

46

26

7

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Manufacturer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Stairs
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Flashing and Sheet Metal, Flexible Flashing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, HVAC Fans
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Identification for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
30
Bidding Soon
463
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2022

September 1, 2022

img_map_placeholder

1715 Volunteer Blvd, Knoxville, TN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Art and Architecture Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.