Site work, new construction and renovation of a water / sewer project in Tampa, Florida. Working plans call for the renovation of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

As of October 1, 2020, the Master Plan project is still in pre-design phase and we are at the beginning of pilot studies and installation. A design/builder has been selected. A firm construction timeline has not been established. Questions to: contractadministration@tampagov.net. The City of Tampa Water Department desires to obtain Design-Build Services for various projects identified within the Master Plan developed for the David L. Tippin Water Treatment Facility (DLTWTF). Services will be provided under a contract with negotiated fixed fees for the assessment of the needs for the rehabilitation and improvement projects, selection and evaluation of design alternatives and requirements, development of construction sequencing and project phasing needed to maintain plant operations and reduce construction cost, final design, permitting, project management, overhead, profit, and development of a guaranteed maximum price with appropriate surety bonds. Services will also include, but not limited to, engineering investigations, site planning, cost estimating, advertising and administration of subcontracts, start-up, preparation of O&M manuals, training, and all related work required for a complete project. The successful Design-Build Firm will provide a Team that has successfully completed projects of similar size and complexity, has the resources to simultaneously design and construct multiple projects, and has the experience and knowledge of the requirements to complete treatment plant projects while maintaining 24/7 treatment plant operations. The scope of the design-build contract will include the rehabilitation of existing facilities and construction of new facilities identified in the design criteria package, which is based on the recommendations provided in the DLTWTF Master Plan (July 2018). Each recommended improvement listed will be evaluated and updated prior to implementation. "Firms desiring to provide these services to the City must submit a single electronic file in searchable PDF format, Smaller than 5MB, that includes the attached RFQ Transmittal Memorandum completed as appropriate, a Letter of Interest addressed to Brad L, Baird, P.E.,Chairman, and referring to this RFQ by number, together with a Statement of Qualifications and any supplemental material allowing evaluation for further consideration (short-listing) based upon the following criteria/point system: Successful Comparable Project Experience, (30 pts); Municipal Water Treatment Plant Experience (25pts); Workload and Availability (5 pts); Past Performance/Low amount of City Work (5 pts); Standard Form #A305 (5 pts); Planned WMBE/SLBE Solicitation & Utilization, Form MBD 10 & 20 (20 pts);Workforce Development (10 pts). Questions may be directed to Jim Greiner, P.E., Contract Administration, City of Tampa, (813) 274-8598, or E-Mail jim.greiner@tampagov.net. As of 5/11/2020 the owner has selected a design builder, there will be a Joint Venture between A Garney and Wharton-Smith. A timeline for construction has not yet been established.

Pre-Construction/Negotiated

Water / Sewer

$300,000,000.00

Public - City

New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
69
Bidding Soon
1,338
All Active Projects
502
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2020

December 7, 2020

img_map_placeholder

7125 N 30th St, Tampa, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.