BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Baltimore, Maryland. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.

Care and respect must be maintained especially since the work will directly impact the adjacent communities. Loud noise work cannot occur prior to 8:00 a.m. and must conclude by 8:00 p.m. No workers shall park in the adjacent neighborhoods (anyone caught will be asked to leave the project and will not be permitted to return). Due to limited parking on campus, worker parking will likely be in Lot Y or remotely at Lake Clifton and may change during the project. The property on the immediate north of the north wall (community side), the site parking and green space are Morgan property and to the sidewalks on the west side of the site. Work Includes But is Not Limited To: 1. Demolition 2. Excavation and Fill 3. Paving 4. Walks (concrete, asphalt, pavers) 5. Structural Modular Walls 6. Security Fencing (around the perimeter of the site) 7. Landscaping 8. Utility Work 9. Conduit for New Electrical Vehicle Charging Stations 10. Electrical / Lighting 11. Camera 12. Storm Water Management 13. Traffic Management 14. Striping and Signage 15. Phasing of Work 16. Inspection and Testing Scope Review(s) October 12 / 13, 2022 11:30am-1:30pm and 11am-1pm Last Day for Receipt of Questions September 23, 2022 12:00 noon Responses to Questions Published September 27, 2022 COB Substantial Completion Dates: August 4, 2023 Final Completion Date: October 30, 2023 No On-Site Work Days Freshmen Move In 2023 August 11/14, 2023 Homecoming October 2023 (Date to be Determined) Spring Commencement 2023 May 20, 2023 Limited-Work Days Special Events yet to be determined - Assume a total of 5 business days. Liquidated Damages Liquidated Damages may apply to this Project in the amount of $150.00/calendar day should the Contractor not meet the stated milestone dates. Prevailing Wage Rates shall be required for this project. The University has established an overall project goal of Thirty percent (15%) MBE Participation. This means that at the completion of the overall project, the goal of 15% has been achieved or exceeded.

Award

Sidewalks / Parking Lot

$10,000,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
118
Bidding Soon
2,434
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

November 1, 2022

img_map_placeholder

1600 Havenwood Rd, Baltimore, MD

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.