BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a water / sewer project in Port St Lucie, Florida. Conceptual plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

**Per the owner, this project is still canceled and as of 4/21/2021 there is no current information on a possible rebid.** As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information The project more specifically includes the following: 1. Pretreatment Screening and Grit Removal Additions. Work includes provision and installation of a new influent screen and a new grit removal system including a grit removal unit, grit pumps, and all associated piping and appurtenances. Connecting the existing grit removal unit to the new system is also included. A new control panel and all associated electrical/instrumentation/SCADA work is also included. 2. Anoxic/Aeration Process Basin Additions. Work includes the provision and installation of three (3) additional biological treatment trains, including anoxic/aeration basins and associated equipment such as mixers, mechanical surface aerators, and internal recycle pumps. New control panels, DO instruments and all associated electrical/instrumentation/SCADA work is also included. 3. Clarification Process Additions. Work includes the construction of a new 80-foot diameter clarifier and provision and installation of all associated equipment and piping. A new control panel and all associated electrical/instrumentation/SCADA work is also included. 4. RAS/WAS Pump Station Additions. Work includes the provision and installation of one (1) new RAS pump and one (1) new WAS pump and all associated piping to the existing pumping systems. The pumps will be installed on existing rail systems. All associated electrical/instrumentation/SCADA work is also included. 5. Filter Dosing Pump Station Addition. Work includes the provision and installation of one (1) new filter dosing pump and all associated piping to the existing pumping system. All associated electrical/instrumentation/SCADA work is also included. 6. Reclaimed Water Pump Station Additions. Work includes the provision and installation of one (1) new reclaimed water pump and all associated piping to the existing pumping system. All associated electrical/instrumentation/SCADA work is also included. 7. Chlorine Feed System Additions. Work includes the provision and installation of a new chlorine storage and feed system utilizing ton chlorine gas containers, vacuum injection into a carrier water system, all associated piping including chlorine solution piping to the injection points, and new solution injectors. A new chlorine storage and feed building, and all associated HVAC, plumbing, and electrical/instrumentation/SCADA work is also included. 8. Electrical System Additions/Modifications. Work includes providing and installing all equipment associated with updating the electrical system to meet EPA Class I Reliability to avoid common mode failures, upgrades to equipment and systems to meet requirements of NFPA 820, and all electrical work associated with the process improvements. No upgrades to the existing standby generators or standby capacity are included. Installing empty conduits to the proposed IW-2 location is also included. Two (2) new electrical buildings to house the new major electrical system components are also included. 9. Instrumentation and Control System Additions/Modifications. Work includes upgrading the existing PLCs with new PLCs in their current locations and upgrading the SCADA servers with new units including OS and HMI software upgrades. All instrumentation/SCADA work associated with the process improvements is also included. Note: The Contractor shall be responsible for erosion controls and the vertical and horizontal location of all utilities for this project. The cost for erosion controls and utility location work shall be included in bid item for Phase II Construction. All items not specifically identified in the bid reply sheet are considered to be incidental to other pay items in the contract. Also, any item not included in the attached specifications shall be covered under the City of Port Saint Lucie Utility Systems Department Utility Standards Manual. Bid Bond: 5% The City of Port St. Lucie reserves the right to reject any and all proposals, to waive any and all informalities or irregularities, to negotiate with any qualified Proposers, and to accept or reject all or any part of any proposal as it may deem to be in the best interest of the citizens of the City. The last date for questions has been changed to January 3, 2020

Project Abandoned

Water / Sewer

$29,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

272

27

79

11

Subscribe For Documents

143 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
113
Bidding Soon
1,447
All Active Projects
621
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 6, 2023

February 29, 2024

img_map_placeholder

3721 SW Darwin Blvd, Port St Lucie, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.