BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Coeur D Alene, Idaho. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and bridge / tunnel.

As of March 15, 2022, this project has already been completed. *The previous solicitation is listed below for reference This Sources Sought Notice is a request for information to be used for preliminary market research and planning purposes only. The Government is seeking responses from contractors interested and capable of performing the required construction services. No proposals are being requested or accepted. This is not a solicitation and no contact will be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this notice. The purpose of this notice is to gain knowledge of interest, capabilities, and qualifications of interested parties including Small Business; 8a; Historically Underutilized Business (HUBZone); Service Disabled Veteran-Owned Small Business (SDVOB); and Women Owned Small Business (WOSB). The Coeur d Alene River Ranger District, Idaho Panhandle National Forests expects to solicit for Burnt Cabin Road 206, road construction, riparian, and stream restoration work in the Burnt Cabin drainage. Work consists of constructing approximately 1.23 miles of road, constructing approximately 0.8 miles of new sections of stream channel and floodplain, and will need to be sequenced to accommodate traffic needs. Road work consists of clearing and grubbing, hauling and decking trees and trees with rootwads to designated decking sites on Road 206, installing culverts, constructing catch basins, placing fill slope riprap and installing a government-provided sign base. Work associated with constructing new sections of stream channel and floodplain may only begin after road construction is complete. Option Item work may be included and consists of rock blasting, watering, and placing surface aggregate. The project area is located in Sections 7, 8, 17, 18 of T.51N. R.1W. of Kootenai County Idaho. From Coeur d'Alene, travel East on Road 268 around Fernan Lake for 10 miles to Fernan Saddle. Continue on Forest Road 612 for 10.7 miles to Forest Road 209, turning left and traveling upriver. Travel 5 miles, turning left on Forest Road 206 and the project location. From Smelterville, travel West on I-90 for 5 miles and take Exit 43 (Kingston). Turn right and travel approximately 5 miles Northeast up the North Fork of the Coeur d'Alene River, turn left on Bumblebee Cut-off and travel approximately 24.6 miles on Forest Road 209 and turn left onto Forest Road 206 which is the start of the project site. Refer to individual plan maps. Estimated Price Range between $500,000 and $1,000,000. The period of performance is anticipated June 2020 to October 1, 2021. Work in the actively flowing channels will only be allowed after July 15th until December 31st of each calendar year The responses shall include: Name of Firm, Point of Contact, mailing address, email address and telephone number. DUNS number Identification of the appropriate small business eligibility as determined by the NAICS size standards. SB, HUBZone, 8a, SDVOB or WOSB. A brief description of experience providing this type of work especially on Forest Roads, including dollar value of previous relevant work performed within the past three years. The method of contractor selection has not been determined at this time.

Occupancy

Roads / Highways

$1,000,000.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
3
Bidding Soon
106
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2020

img_map_placeholder

Burnt Cabin Rd, Coeur D Alene, ID

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.