Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Wilkes Barre, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
For the Improvement of Certain Section of Highways and Bridges in Luzerne County, Hanover & Plymouth Townships, Commonwealth of Pennsylvania, State Route 0029, Section P22. The Project Being Situated as Follows: From a Point Near the Intersection With Sr 2002 at Segment 0080, Offset 0938 to a Point Near Sr 0011 at Segment 0090, Offset 3414 Along Sr 0029-northbound. From a Point Near the Intersection With Sr 2002 at Segment 0081, Offset 0928 to a Point Near Sr 0011 at Segment 0091, Offset 3416 Along Sr 0029-southbound. This Project Involves Priority 1 Bridge Repairs of the Existing 11-span Structure Carrying Sr 0029, Section P22 Over the Nanticoke Creek, Susquehanna River and Norfolk Southern Railroad. The Work Will Include Resetting of Expansion Bearings, Replacement of Missing Rivets, Steel Girder Repairs, Spot Painting, Tack Weld Removal, Repair Deteriorated Concrete and Tree Trimming. Temporary Cross Overs, and Temporary Paving on the Shoulder Will Be Utilized to Maintain Traffic During Construction. Also, the Sr 0029 - Section P30 (Over Sr 0011) Work Will Include but Not Limited to, the Resetting of Bearings, Cleaning of Bridge Seats, Heat Straightening, Installation of Steel Diaphragms, Mill and Bituminous Over Lay on the Bridge, Type 2 & 3 Bridge Deck Repairs, and Full Depth Pavement Reconstruction and Mountable Median Curb Replacement on the Roadway Approaches. Traffic Control Will Require Temporary Median and Shoulder Pavement as Well as Temporary Crossovers on Sr 0029. Temporary Median Pavement Will Be Required to Shift Traffic Accordingly and Complete Necessary Work on Sr 0011. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 65.00% Let Type: Scheduled Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes All inquiries must be submitted electronically to ECMS, Do not contact the owner or engineer contacts. PennDOT - SR 29 Over Susq River and RR Bridge Preservation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SR/SEC/Group ID: 29/P22/---
Award
Bridges / Tunnels
$4,728,445.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2022
May 16, 2022
PA-29, Wilkes Barre, PA
Related To This Project
Wilkes Barre, PA
Bid Date: Apr 12 2022
Wilkes Barre, PA
Bid Date: Dec 10 2019
Wilkes Barre, PA
Bid Date: May 10 2022
Wilkes Barre, PA
Bid Date: May 11 2022
Wilkes Barre, PA
Bid Date: May 06 2022
Wilkes Barre, PA
Bid Date: May 12 2022
Wilkes Barre, PA
Bid Date: Apr 13 2022
Wilkes Barre, PA
Bid Date: Apr 20 2022
Wilkes Barre, PA
Bid Date: Dec 14 2022
Wilkes Barre, PA
Bid Date: Jan 06 2023
Wilkes Barre, PA
Bid Date: Jul 25 2023
Wilkes Barre, PA
Bid Date: Jan 06 2023
Wilkes Barre, PA
--
Wilkes Barre, PA
Bid Date: Dec 15 2022
Wilkes Barre, PA
Bid Date: Nov 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.