BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Cherry Point, North Carolina. Completed plans call for the renovation of a water / sewer project.

This procurement is restricted to the General MACC contractors. Only the General MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of war and any applicable drawings. NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction, $36.5 Million Contract Completion Date: All work shall be completed in two phases totaling 380 calendar days after award. Phrasing is outline below: Phase 1: 180 days Phase 2: 200 days Project total: 380 days Estimated Cost Range: Between $1,000,000 and $5,000,000 Wage Determination: General Decision NC180065 Building dated 07/13/2018 NC65 Liquidated Damages: Will be determined per phase Phase 1: $681 per calendar day of delay Phase 2: $613 per calendar day of delay Basis for Award: Lowest Price Proposal Acceptance Period: 90 days after receipt of proposal Bid bonds are required in accordance with FAR 28.101-1 (for projects over $150,000). An electronic copy of your bid bond must be submitted with your proposal. A hard copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) business day from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. No bonds are required for proposals less than $35K. Proposals valued at $35K and greater will require a payment bond only. Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. RFIs must be submitted email addresses above. The cut off for RFIs is 30 December 2019 by 0900 in order to process all inquiries by the proposal due date.

Post-Bid

Water / Sewer

$5,000,000.00

Public - Federal

Renovation

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
20
Bidding Soon
330
All Active Projects
134
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2020

March 13, 2020

img_map_placeholder

To Be Determined, Cherry Point, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.