BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Pittsburgh, Pennsylvania. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project is included in the FY2024-2029 Capital Improvement Plan. As of September 27, 2024, the project is in preliminary engineer through 2024. Final design is expected from 2025-2026 with construction anticipated to begin in 2027. *The closed solicitation has been included below for reference: The bridge carries 28th Street over two lanes of Sassafras Way, the Port Authority East Busway, and Norfolk Southern Railroad (NSRR) tracks and connects Liberty Avenue to Brereton Street (Polish Hill). Because the existing bridge is NHRP eligible, a Historic Bridge Rehabilitation Analysis will be required in addition to a Purpose and Needs statement to consider anticipated multi- modal usage. Depending on the findings of the Historic Bridge Rehabilitation Analysis, the scope of work will proceed for a rehabilitation or a replacement project. For a rehabilitation option, it is anticipated that the limits of work will extend from approach slab to approach slab (inclusive) with minor changes to the horizontal and vertical alignments, as needed. For a replacement option, the scope of work will include a task for alignment investigation in order to provide alternatives for improving the approach geometry at the north end of the structure as well as reducing the structure span length and considering anticipated usage, including bicyclist and pedestrians. The alignment investigation should provide vertical alignment that provides the minimum vertical clearance requirement for a railroad crossing. The City will be using the modified consultant selection process for securing the professional services. The anticipated Notice to Proceed is July 1, 2020. The method of contractor selection has not been determined at this time.

Design

Bridges / Tunnels

$6,710,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
44
Bidding Soon
842
All Active Projects
325
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2027

img_map_placeholder

28th St, Pittsburgh, PA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.