Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 27, 2024 at 8:00 PM
Updated September 28, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Pittsburgh, Pennsylvania. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The project is included in the FY2024-2029 Capital Improvement Plan. As of September 27, 2024, the project is in preliminary engineer through 2024. Final design is expected from 2025-2026 with construction anticipated to begin in 2027. *The closed solicitation has been included below for reference: The bridge carries 28th Street over two lanes of Sassafras Way, the Port Authority East Busway, and Norfolk Southern Railroad (NSRR) tracks and connects Liberty Avenue to Brereton Street (Polish Hill). Because the existing bridge is NHRP eligible, a Historic Bridge Rehabilitation Analysis will be required in addition to a Purpose and Needs statement to consider anticipated multi- modal usage. Depending on the findings of the Historic Bridge Rehabilitation Analysis, the scope of work will proceed for a rehabilitation or a replacement project. For a rehabilitation option, it is anticipated that the limits of work will extend from approach slab to approach slab (inclusive) with minor changes to the horizontal and vertical alignments, as needed. For a replacement option, the scope of work will include a task for alignment investigation in order to provide alternatives for improving the approach geometry at the north end of the structure as well as reducing the structure span length and considering anticipated usage, including bicyclist and pedestrians. The alignment investigation should provide vertical alignment that provides the minimum vertical clearance requirement for a railroad crossing. The City will be using the modified consultant selection process for securing the professional services. The anticipated Notice to Proceed is July 1, 2020. The method of contractor selection has not been determined at this time.
Design
Bridges / Tunnels
$6,710,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2027
28th St, Pittsburgh, PA
Related To This Project
Pittsburgh, PA
Bid Date: Feb 09 2023
Pittsburgh, PA
Bid Date: Feb 02 2023
Pittsburgh, PA
Bid Date: Feb 02 2023
Pittsburgh, PA
Bid Date: Feb 07 2023
Pittsburgh, PA
Bid Date: Feb 09 2023
Pittsburgh, PA
Bid Date: May 06 2020
Pittsburgh, PA
Bid Date: Feb 15 2023
Pittsburgh, PA
Bid Date: Feb 08 2023
Pittsburgh, PA
--
Pittsburgh, PA
Bid Date: Feb 06 2023
Pittsburgh, PA
Bid Date: Jan 26 2023
Pittsburgh, PA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed