BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and renovation of a bridge / tunnel in Nickerson, Kansas. Completed plans call for the demolition of a bridge / tunnel; for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Principal Items of Work: Bridge Grading Surfacing Signing Pavement Marking Seeding Guardrail Each bidder is required to deposit with his Proposal a cashier's check, bid bond, a certified check, or a bank draft in the sum of five percent of the amount bid, said deposit to be made payable to Reno County. The above required deposit will serve as a guarantee that he will file all bonds, or security in the form of a cashier's check; certified check; or bank draft in the sum of one hundred percent (100%) of the proposal amount, required and enter into the Contract, should it be awarded to him, according to the terms of his bid, within seven (7) days after the award of Contract. Should the Contractor fail to file approved surety bonds, or specified security, or enter into Contract with Reno County, Kansas, then the bid surety may be forfeited as liquidated damages, and the money realized therefrom be turned into the Reno County Treasurer. The work to be performed under this Contract shall be completed within two hundred and eighty (280) working days. This period of time will be counted as commencing with the date of issuance of a work order by the Reno County Public Works Director. Saturdays, Sundays, and Holidays observed by the County shall be excluded in the counting of workdays. The Director will have authority to interrupt the work as provided in paragraph 1.22.4 of the General Specifications during which period days will not be counted. To accomplish this "Stop Work" and "Resume Work" orders will be given. The time of completion is an essential part of this Contract since the Owner will suffer additional expense for financing and administering the work if the work is not completed within the time limit specified above. Therefore, the Contractor shall reimburse the Owner, as liquidated damages, for said additional expense at IB-1 The Owner reserves the right to reject any or all Bids, to waive formalities in considering Bids and to accept the Bid which, in its opinion, is the best Bid.

Award

Bridges / Tunnels

$2,997,841.00

Public - County

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
17
Bidding Soon
202
All Active Projects
84
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2020

October 14, 2020

img_map_placeholder

N Nickerson Rd, Nickerson, KS

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.