Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a transportation facility in Spokane, Washington. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.
https://www.spokesman.com/stories/2021/apr/25/the-dirt-spokane-international-airport-planning-re/ The Spokane International Airport is planning extensive remodels to its ground transportation center and rental car return area. Spokane-based DCI Engineers has filed a preliminary application with the city on behalf of the Spokane Airport Board last week to build a 9,000-square-foot vehicle canopy for pedestrian pickup on the east side of the airport's ground transportation center. Work also calls for remodeling an existing rental car ticketing area inside of the ground transportation center and converting an existing pedestrian canopy on the east side of the building into a 1,120-square-foot enclosed entryway, according to the application. Other site improvements include upgrades to lighting, drainage, signage and pavement. The project is slated to break ground in September and estimated to cost $3.5 million, according to the application. The rental car facility improvements are funded by a customer facility charge, which is a fee paid by rental car customers. Spokane-based Wolfe Architectural Group is designing the project __________________________________________________________________ The Spokane Airport Board is requesting proposals for General Contractor/Construction Manager Services for the SIA Terminal Renovation and Expansion Project using the procedure permitted under Chapter 39.10 of the RCW, as amended, for public works contracting in lieu of sealed bids For further information, contact Lisa Corcoran, Manager, Planning & Engineering Depart-ment, at lcorcoran@spokaneairports.net. The Spokane Airport Board reserves the right to reject any and all submittals, to waive any irregularities in the submittals received, and to accept the submittal deemed most advantageous to the Board. All submittals become property of the Spokane Airport Board. The Spokane Airport Board is an equal opportunity employer. Project Scope: The TREX Project will improve and provide more efficient airport passenger circulation and airline operations to meet current and near-term passenger and operational needs. The TREX project consists of Concourse C west gate expansion with three passenger boarding bridges, expansion/modernization of Concourse C east to connect four existing ground boarding gates, expansion of Concourse C ticketing and expansion of baggage makeup. The project includes construction of approximately 126,000SF. The project is currently broken into five (5) primary elements of work: 1. Concourse C west gate expansion for bridge gate boarding 2. Baggage makeup to support expansion. 3. Demolition of existing Concourse C east ground boarding area and expansion of new Concourse C east gate expansion with ground board apron access ramp. 4. Expansion of Concourse C ticketing. 5. Modernization of existing upper Concourse C. 2.2 Project Budget: The project is to be funded by multiple bond issuances backed by a combination of local PFC's, and general airport revenues. The total project budget is estimated at approximately $96,000,000. The project Maximum Allowable Construction Cost (MACC) for use in this proposal is $66,300,000. Additional project descriptions will be provided during the mandatory Pre-Proposal Conference.
Award
Transportation Terminals
$96,000,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 23, 2021
July 1, 2022
9000 W Airport Dr, Spokane, WA
Related To This Project
Spokane, WA
Bid Date: Apr 13 2022
Spokane, WA
Bid Date: Jun 03 2022
Spokane, WA
Bid Date: Jun 03 2022
Spokane, WA
Bid Date: Sep 09 2021
Spokane, WA
--
Spokane, WA
--
Spokane, WA
--
Spokane, WA
Bid Date: May 27 2022
Spokane, WA
--
Spokane, WA
--
Spokane, WA
Bid Date: May 23 2022
Spokane, WA
Bid Date: May 16 2022
Spokane, WA
Bid Date: May 13 2022
Spokane, WA
Bid Date: Mar 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.