BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Orlando, Florida. Completed plans call for the renovation of a municipal facility.

As of September 1st, 2022 this project is pending an award decision. The project is to replace Service Entrance Switchgear (SES) circuit breakers, and upgrade the Programmable Logistic Controls (PLC and Circuit Monitor Control System. Additionally, the project is to replace the following: 1. Switchboard NS52 (main circuit breaker) via transformer USS-C3 (building C, 5th floor, south). 2. Switchboard DP221N (main circuit breaker) via transformer USS-C4 (building Ctower 22nd floor). 3. Switchboard DP221S (main circuit breaker) via transformer USS-C4 (building Ctower 22nd floor). 4. Switchgear NSBA (main circuit breaker) via transformer USS-A1 (building A, basement). 5. Tie breaker C4A & C4B tie breaker. 6. Upgrade local symax controllers for USS-C4A along with CEP A and CEP B controllers. 7. Provide alternate power source (automatic transfer switch) for city of Orlando equipment, and Orange County radio equipment from 5th floor SWBN-NS52. 8. Provide alternate power source (automatic transfer switch) for UPS-A2 and UPSA3 from building B SWBD-NSBB. The question deadline date will be changed to July 11, 2022 by 5:00 pm EST

Bid Results

Municipal

$5,932,000.00

Public - County

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
159
Bidding Soon
2,646
All Active Projects
1,101
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 2, 2022

October 3, 2022

August 29, 2023

img_map_placeholder

425 N Orange Ave, Orlando, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.