BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2020 at 7:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in Denver, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construction of a bike/pedestrian box culvert underpass for the High Line Canal Trail crossing under Parker Rd and Mississippi Ave. for the City and County of Denver as the (Local Agency), and its partners, Arapahoe County and CDOT Region 1. The Local Agency project is located in the City and County of Denver (North) and Arapahoe County (South). The new underpass will significantly improve the safety and experience of the High Line Canal Trail for pedestrians and cyclists as well as creating a faster/safer pedestrian connection across Parker Road while enhancing traffic operations. The proposed box culvert is 14-ft wide, 10-ft tall, and ~245-ft long. Retaining walls will be constructed along the underpass approaches, between the trail and service road and on the south side of the trail. Estimated Construction Cost: Between $4,000,000.00 and $4,400,000.00 Questions Deadline: January 14, 2020 at 10:00 a.m. local time Prequalification 1A Heavy Civil at or the $6,000,000.00 monetary level 18% Minority/Women Business Enterprise (M/WBE) Participation

Bid Results

Bridges / Tunnels

$5,171,087.00

Public - City

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
67
Bidding Soon
1,181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2020

April 20, 2020

Project location map

E Mississippi Ave & S Parker Rd, Denver, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.