BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Espanola, New Mexico. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Torrance County plans to repair and pave Riley Road from the intersection of State Highway 55 to the intersection of State Highway 542. The renovation of Riley Road, which is currently chip-sealed, requires 3-inches of asphalt paving for a 6-mile stretch, 20-feet wide. The chip-sealed surface will provide a solid base. The road has been previously re-claimed and re-chipped; however, vehicles that exceed the weight limit frequently use the road causing new damage. Weight limit signs have been vandalized and torn down. Asphalt paving will increase the weight limit to accommodate semitrucks. An estimated 700-800 vehicles use the road daily. Riley Road provides a quick connection between the two highways without traveling 10 miles east to State Highway 41 or 7 miles west to the portion of Highway 55 that parallels the Manzano Mountains. The road is also used as an evacuation route during wildfires and provides convenient access for emergency vehicles and for the road department to access supplies such as gravel and caliche. The project will be completed as a stand-alone project. Since the roadway is an existing roadway, it does not require engineering or planning. Traffic control is planned for the duration of the project which is anticipated to take 16 work days barring weather delays. No maintenance costs are expected during the first five years following project completion As of April 1, 2021, this project is currently in the FY 2022-2026 CIP. Information regarding design team and contractor selection has not been disclosed. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,900,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
3
Bidding Soon
153
All Active Projects
65
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

img_map_placeholder

Riley Rd, Espanola, NM

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.