Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Huntington, West Virginia. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.
Project work includes: Schedule 1 Rental Car Ready Lot Improvements Schedule 2 Airfield Pavement Maintenance and Repair Reconstruction work includes demolition, excavation, installation of drainage infrastructure, electrical improvements, site security improvements, grading, paving operations, and erosion control. All bidders shall submit evidence of competency and evidence of financial responsibility with their bid. Subcontractor experience documentation is also required to be submitted with the bid documents. Failure to provide this documentation may be grounds for determining the bid non-responsive. 6) FEDERAL REQUIREMENTS: All bidders are responsible for compliance with Federal requirements for preparation and submission of the proposal.The successful bidder shall be responsible for compliance with Federal Requirements in the Contract Agreement. 7) LICENSING: Each bid must be by a contractor properly licensed under "West Virginia Contractor Licensing Act". The bidders shall certify, by submission of a proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in this transaction by any Federal department or agency or the State of West Virginia. A bid guaranty made payable to the Tri-State Airport Authority in the form of either a certified or cashier's check or in the form of a bid bond for no less than 5% of the total bid is required with each bid. The successful bidder shall execute a Performance Bond and a Payment Bond, each in the amount of 100% of the Contract Price.No Bidder may withdraw an opened bid for a period of 90 days following the bid opening without Tri-State Airport Authority's consent. Award for the project will be made to the lowest responsible qualified Bidder, if awarded. The Owner reserves the right to reject any or all bids and to waive any informalities, technicalities or omissions therein. See Instructions to Bidders for further reservations or rights. The Contractor agrees to commerce work within ten (10) days after written notice to proceed is issued or on the first day of construction, whichever days occurs first, and shall be completed within 100 working days ofthe commencement date. All work must be completed within 45 Working Days from date of issuance of the Commence Construction Notice-to-Proceed. Phase 1A must be completed prior to the start of Phase 1B. All Phase 2 subphases may be concurrent with all other phases and subphases, but must be completed prior to completion of Phase 1B.
Award
Transportation Terminals
$754,373.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2020
February 20, 2020
1449 Co Rte 3/1, Huntington, WV
Related To This Project
Huntington, WV
Bid Date: Aug 21 2019
Huntington, WV
Bid Date: Jul 13 2022
Huntington, WV
Bid Date: Aug 11 2022
Huntington, WV
Bid Date: Jan 13 2023
Huntington, WV
Bid Date: Jul 18 2024
Huntington, WV
--
Huntington, WV
Bid Date: May 11 2023
Huntington, WV
Bid Date: May 18 2021
Huntington, WV
Bid Date: Aug 11 2022
Huntington, WV
Bid Date: Jun 16 2021
Huntington, WV
Bid Date: Jun 23 2022
Huntington, WV
Bid Date: Jul 06 2022
Huntington, WV
Bid Date: Jul 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.