Demolition, site work, asbestos abatement, renovation and addition to a medical facility in Brentwood, New York. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; for the renovation of a medical facility; for site work for a medical facility; and for asbestos abatement for a medical facility.

**As of February 26, 2021 this project has not yet been awarded. A timeline for award has not yet been established.** Single Prime Contract to complete Interior and Exterior Renovations including the following: 1.) Phased Project in an Occupied Building completed under a Project Labor Agreement (PLA) including a minimum of (12) Phases with each Phase estimated at 5 months per Phase including (4) months for Construction and (1) month for turnover and relocation. Phases are to be completed consecutively (one after the other). 2.) Site Preparation including staging, providing lockable temporary air-tight barriers to separate Construction areas from Occupied spaces and access to temporary entrances. 3.) Asbestos Removal- Abatement of approximately 57 Linear Feet of caulking at Basement Windows, approximately 57 Linear Feet of caulking at the 1st and 2nd floor window cladding and approximately 116 Square Feet of Black Tar Mastic removal at the perimeter of the exterior masonry window openings, 4.) Selective Demolition. 5.) Exterior Closure- Removal and Replacement of approximately 458 Windows including the removal, storage and re-installation of existing Security Screens, removal and replacement of existing Steel Lintels and associated masonry repair and removal/replacement of the windows. 6.) Interior Renovation including miscellaneous partition demolition, new partition installation, existing door replacement and/or new door installation, interior glazed opening installation or replacement, construction of new interior soffits, ceilings and finishes. 7.) Fire Protection specialties- relocation or providing new miscellaneous devices and specialties. 8.) Interior finishes and built-in casework. 9.) Food Service Equipment relocation including relocation to temporary space, temporary power and relocation to original location upon completion of work. 10.) Bathroom and Kitchen Renovations- including additions, alterations, relocations, modifications and revisions to the DCW & DHW distribution, sanitary/waste systems and plumbing fixtures 11.) Fire Protection system- Providing a full NFPA 13 sprinkler system throughout the Building utilizing a portion of the existing partial coverage sprinkler system. 12.) HVAC and equipment- installation of (2) new Air Handling Units form the Basement through the second floor of the SE Wing- (1) Unit to service the 1st floor Kitchen/Dining Area and (1) Unit to service the second floor Recreational space above the Kitchen/Dining Area and miscellaneous stand-alone cooling systems at the 1st floor Kitchen area. 13.) HVAC instrumentation and controls related to all new HVAC systems. 14.) Electrical Service and Distribution modifications including additions, alterations, modification and revisions to accommodate all new HVAC systems, temporary and final relocation of equipment and interior renovations including power and lighting. 15.) Interior Lighting- revisions to accommodate all interior wall or room reconfiguration. 16.) Fire Alarm detection system- including all additions, alterations, relocations, modifications and revisions to the existing FA system to interconnect all new HVAC systems, interconnection of new NFPA 13 sprinkler system and relocation/modifications to FA devices to accommodate all interior partition or room reconfiguration. Construction Duration- 60 months Estimated Construction Start- 3/1/2019 Estimated Construction Completion- 3/1/2024 Construction Estimate- $8,500,000- $9,000,000 The Dormitory Authority of the State of New York ("DASNY") has determined that its interest in obtaining the best work at the lowest possible price, preventing favoritism, fraud and corruption, and other considerations such as the impact of delay, the possibility of cost savings advantages and any local history of labor unrest are best met by use of a Project Labor Agreement ("PLA") on this Project. The successful low bidder, as a condition of being awarded this Contract, will be required to execute the PLA described in the Information for Bidders and included in the Contract Documents. See Section 18.0 of the Information for Bidders of the Contract Documents for additional information. All subcontractors of every tier will be required to agree to be bound by the PLA. A complete set of Contract Documents may be viewed and/or purchased online from Camelot Print and Copy Centers. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. DASNY takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued. In addition, prospective bidders are advised that the Contract Documents for this Project contain new ''GENERAL CONDITIONS for CONSTRUCTION'' dated May 1, 2018 that contain significant revisions from those documents previously contained in DASNY's Contract Documents. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 18% Women Owned Sub-Contracting Goal: 12% Service-Disabled Veteran-Owned Business Contracting Goal: 6%

Award

Medical

$6,393,000.00

Public - State/Provincial

Addition, Asbestos Abatement, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

163 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Parking Areas, Temporary Barriers and Enclosures, Temporary Dust Barriers, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Stressing Tendons, Cast-in-Place Concrete, Post-Tensioned Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Stone Anchors, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Sheet Waterproofing, Thermal Protection, Thermal Insulation, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Stone Facing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Bath Accessories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Hangers and Supports for Fire-Suppression Piping and Equipment, Fire Suppression Systems Insulation, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping, Electrical Utilities, Utility Transformers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
277
Bidding Soon
4,243
All Active Projects
1,914
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2020

April 26, 2021

img_map_placeholder

998 Crooked Hill Rd, Brentwood, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New York State Office of Addiction Services and Supports Charles K. Post Addiction Treatment Center Conversion including Asbestos Removal

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.