Demolition, site work, asbestos abatement, renovation and addition to a medical facility in Brentwood, New York. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; for the renovation of a medical facility; for site work for a medical facility; and for asbestos abatement for a medical facility.

**As of February 26, 2021 this project has not yet been awarded. A timeline for award has not yet been established.** Single Prime Contract to complete Interior and Exterior Renovations including the following: 1.) Phased Project in an Occupied Building completed under a Project Labor Agreement (PLA) including a minimum of (12) Phases with each Phase estimated at 5 months per Phase including (4) months for Construction and (1) month for turnover and relocation. Phases are to be completed consecutively (one after the other). 2.) Site Preparation including staging, providing lockable temporary air-tight barriers to separate Construction areas from Occupied spaces and access to temporary entrances. 3.) Asbestos Removal- Abatement of approximately 57 Linear Feet of caulking at Basement Windows, approximately 57 Linear Feet of caulking at the 1st and 2nd floor window cladding and approximately 116 Square Feet of Black Tar Mastic removal at the perimeter of the exterior masonry window openings, 4.) Selective Demolition. 5.) Exterior Closure- Removal and Replacement of approximately 458 Windows including the removal, storage and re-installation of existing Security Screens, removal and replacement of existing Steel Lintels and associated masonry repair and removal/replacement of the windows. 6.) Interior Renovation including miscellaneous partition demolition, new partition installation, existing door replacement and/or new door installation, interior glazed opening installation or replacement, construction of new interior soffits, ceilings and finishes. 7.) Fire Protection specialties- relocation or providing new miscellaneous devices and specialties. 8.) Interior finishes and built-in casework. 9.) Food Service Equipment relocation including relocation to temporary space, temporary power and relocation to original location upon completion of work. 10.) Bathroom and Kitchen Renovations- including additions, alterations, relocations, modifications and revisions to the DCW & DHW distribution, sanitary/waste systems and plumbing fixtures 11.) Fire Protection system- Providing a full NFPA 13 sprinkler system throughout the Building utilizing a portion of the existing partial coverage sprinkler system. 12.) HVAC and equipment- installation of (2) new Air Handling Units form the Basement through the second floor of the SE Wing- (1) Unit to service the 1st floor Kitchen/Dining Area and (1) Unit to service the second floor Recreational space above the Kitchen/Dining Area and miscellaneous stand-alone cooling systems at the 1st floor Kitchen area. 13.) HVAC instrumentation and controls related to all new HVAC systems. 14.) Electrical Service and Distribution modifications including additions, alterations, modification and revisions to accommodate all new HVAC systems, temporary and final relocation of equipment and interior renovations including power and lighting. 15.) Interior Lighting- revisions to accommodate all interior wall or room reconfiguration. 16.) Fire Alarm detection system- including all additions, alterations, relocations, modifications and revisions to the existing FA system to interconnect all new HVAC systems, interconnection of new NFPA 13 sprinkler system and relocation/modifications to FA devices to accommodate all interior partition or room reconfiguration. Construction Duration- 60 months Estimated Construction Start- 3/1/2019 Estimated Construction Completion- 3/1/2024 Construction Estimate- $8,500,000- $9,000,000 The Dormitory Authority of the State of New York ("DASNY") has determined that its interest in obtaining the best work at the lowest possible price, preventing favoritism, fraud and corruption, and other considerations such as the impact of delay, the possibility of cost savings advantages and any local history of labor unrest are best met by use of a Project Labor Agreement ("PLA") on this Project. The successful low bidder, as a condition of being awarded this Contract, will be required to execute the PLA described in the Information for Bidders and included in the Contract Documents. See Section 18.0 of the Information for Bidders of the Contract Documents for additional information. All subcontractors of every tier will be required to agree to be bound by the PLA. A complete set of Contract Documents may be viewed and/or purchased online from Camelot Print and Copy Centers. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. DASNY takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued. In addition, prospective bidders are advised that the Contract Documents for this Project contain new ''GENERAL CONDITIONS for CONSTRUCTION'' dated May 1, 2018 that contain significant revisions from those documents previously contained in DASNY's Contract Documents. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 18% Women Owned Sub-Contracting Goal: 12% Service-Disabled Veteran-Owned Business Contracting Goal: 6%

Award

Medical

$6,393,000.00

Public - State/Provincial

Addition, Asbestos Abatement, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

163 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
217
Bidding Soon
4,113
All Active Projects
1,834
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2020

April 26, 2021

img_map_placeholder

998 Crooked Hill Rd, Brentwood, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.