BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Key West Nas, Florida. Completed plans call for site work for a municipal facility.

As of 3/23/2020 project was not yet awarded. Time frame will be on April., Bid Bond Amount 5% Specifications for Transmission Line Insulator Assembly Replacement for 138kV Lines Question End Date 1/31/2020 5:00 PM Failure to submit one (1) original and two (2) copies of each proposal may result in non-compliance and bid may be rejected. Vendors with questions pertaining to this bid specification must submit them in writing via email to purchasing@keysenergy.com no later than January 31, 2020. Any questions received after January 31, 2020 will not be addressed. KEYS reserves the right to reject any or all proposals, to waive irregularities and informalities in any or all proposals, and to separately accept or reject any item, items, bid schedule or bid schedules of the proposal which KEYS deems to be in the best interest of the Utility Board. Within ten (10) days after contractor receives the Notice of Utility Board Approval and prior to the execution of the Contract, contractor shall furnish a Performance and Payment Bond in the form acceptable to KEYS, with corporate Surety satisfactory to KEYS such bond shall insure the full and faithful performance of the Contract, including the payment of faithful performance of the Contract, including the payment of all obligations arising there under, and shall be in an amount equal to (one hundred) 100% of the Total Contract Amount unless otherwise provided in these specifications. Such bond shall further comply in all respects with the laws of the State of Florida. This project is in Monroe County and begins at Line 7 on Marathon (MM47) to Line 9 on Stock Island (US1 substation MM5). The scope of this project covers Lines 6, 7, and 9, all of which are 138kV lines supplying power to the Lower Keys and City of Key West. The work involves the replacement of post insulators on Lines 6, 7, and 9 (138 kV) beginning at US1 Substation, Stock Island, Florida to Line 7 structure #215, Marathon, FL. Lines 6, 7 and 9 consists of square precast concrete, round precast concrete and tubular steel structures. Florizontal Post Insulators are to be replaced on these structures. Posts Insulators will be polymer type. All assembly replacements will be performed while the transmission line is energized

Award

Municipal

$4,533,911.00

Public - City

Site Work

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
28
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2020

April 8, 2020

img_map_placeholder

East Rockland Key, Key West Nas, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.